Robert Boschetti

Greater Albury-Wodonga Area Contact Info
1K followers 500+ connections

Join to view profile

About

Partnering with People, Creating Electrical Solutions.

A top to bottom electrical…

Services

Activity

Join now to see all activity

Experience & Education

  • Boschetti

View Robert’s full experience

See their title, tenure and more.

or

By clicking Continue to join or sign in, you agree to LinkedIn’s User Agreement, Privacy Policy, and Cookie Policy.

Licenses & Certifications

Projects

  • Brake Pressure Indicator

    Brake Pressure Indicator aims to enhance traffic safety for drivers. Normally,tail lights of car have only two stages which are turn on/off based on whether the brake is pressed or not.Tail end accidents typically occur when sudden deceleration by the first car is not detected by the following driver soon enough to allow enough braking time to avoid a collision. The basic idea behind Brake Pressure Indicator is that divide tail light into three levels which are outer, middle, center. Each…

    Brake Pressure Indicator aims to enhance traffic safety for drivers. Normally,tail lights of car have only two stages which are turn on/off based on whether the brake is pressed or not.Tail end accidents typically occur when sudden deceleration by the first car is not detected by the following driver soon enough to allow enough braking time to avoid a collision. The basic idea behind Brake Pressure Indicator is that divide tail light into three levels which are outer, middle, center. Each level turns on or off based on the position of the pedal. Harder the pedal is pressed, more lights turn on and slamming the brake will lead to a quick flash outer LEDs to warn the following driver. Few milliseconds delay may take a driver's life, on the contrary, minimizing the reaction time of the following driver in the event of emergency braking by few milliseconds, number of tail end accidents may be reduced.

    Other creators
  • Bank of America Main Switchroom (£20M)

    -

    - Automation of complex control systems
    - Electrical design
    - Switchboard fit out
    - Commissioning support

  • Bank of England Main Switch Room (£45M)

    -

    - Automation of complex control systems
    - Electrical design
    - Switchboard fit out
    - Commissioning support

  • Bank of Scotland Power Distribution (£30M)

    -

    - Automation of complex control systems
    - Electrical design
    - Switchboard fit out
    - Commissioning support

  • Bega Valley Shire Council Yellow Pinch Dam Project ($7.2M)

    -

    Design, development, testing, commissioning, and documentation of the local & remote control system

  • Burrendong Dam Curtain Control System Project ($4M)

    -

    Electrical design, build and implementation of control systems

  • Canning Plant Installation ($10M)

    -

    - Full electrical and instrumentation design
    - Scope definition
    - Equipment specification
    - Specification / Procurement
    - Construction to the Building Code of Australia

  • Dairy Plant Whey Process Alteration ($47M)

    -

    - Full electrical and instrumentation design
    - Scope definition
    - Equipment specification
    - Specification / Procurement
    - Switchboard design & construction

  • Facebook Data Centre Sweden (£120M)

    -

    - Automation of complex control systems
    - Electrical design
    - Switchboard fit out
    - Commissioning support

  • London Stock Exchange Electricity Security (£80M)

    -

    - Automation of complex control systems
    - Electrical design
    - Switchboard fit out
    - Commissioning support

  • Mollee Weir Fishlock Control System ($9.4M)

    -

    - Full electrical and instrumentation desing
    - Scope definition
    - Equipment specification
    - Specification / Procurement

  • Paper Mill 132T increase production ($145M)

    -

    - Automation of complex control systems
    - Electrical design
    - Switchboard fit out
    - Commissioning support and daily breakdowns

  • Port Botany Terminal Upgrade ($20M)

    -

    - Automation of complex control systems
    - Electrical design
    - Switchboard fit out
    - Commissioning support and daily breakdowns

  • Retail Cheese Plant Installation ($87M)

    -

    - Full electrical and instrumentation design
    - Scope definition
    - Equipment specification
    - Specification / Procurement
    - Construction to the Building Code of Australia

  • Vodaphone Data Centre Power Distribution (£15M)

    -

    - Automation of complex control systems
    - Electrical design
    - Switchboard fit out
    - Commissioning support

  • Waste Treatment PLC & SCADA upgrade

    -

    Design, development and implementation
    Wannnon Waters’ Port Fairy

Honors & Awards

  • 2015 Finalist

    Albury Wodonga Chamber Business Awards

  • 2014 Regional Finalist

    NSW Chamber Business

Languages

  • Italian

    Professional working proficiency

Organizations

  • Rotary Club of Albury Hume

    Member

    - Present

More activity by Robert

View Robert’s full profile

  • See who you know in common
  • Get introduced
  • Contact Robert directly
Join to view full profile

Other similar profiles

Explore collaborative articles

We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.

Explore More

Others named Robert Boschetti

1 other named Robert Boschetti is on LinkedIn

See others named Robert Boschetti

Add new skills with these courses