Once again, we are happy to see one of our digital models turning into physical reality, with all parts fitting neatly! UCB, UCB UK & Ireland , Heatherwick studio, ISG. HESS TIMBER
PROJECT Utilising advanced parametric design and 3D modelling, together with the project participants HESS TIMBER optimised material usage and minimised waste, contributing to cost predictability together with ISG as the Main Contractor. Off-site prefabrication accelerated installation timelines, reducing on-site labour and enabling early occupancy, thereby maximising long-term operational efficiency. “This project demonstrates for the wider construction industry that CLT and timber in general can be as effective as concrete in biophilic design. This will lead other clients to consider timber for buildings that they traditionally thought not possible in timber, therefore helping the mass timber industry and remove excuses not to consider a low carbon option for project developers and other stakeholders within the construction industry.” – Rensteph Thompson, Managing Director at HESS TIMBER More Information about the project: https://lnkd.in/d6GmAUqi Client: UCB Biopharma UK Architect: Heatherwick studio; Veretec (UK) Structural Engineer: AKT II Timber Contractor, Supplier & Engineering: HESS TIMBER Subcontractors to HESS TIMBER: Timber Manufacturer: HASSLACHER NORICA TIMBER Timber Installation: L+S Baucon GmbH Digital Planning & Parametric Modelling: Design-to-Production The project has been shortlisted as a finalist in four categories at the Structural Timber Awards 2024: https://lnkd.in/gfVHqpR7 #fromwoodtowonders #timberlimitless #UK #timber #construction #architecture #STAwards