固蓝海事(重庆)工程技术有限公司

固蓝海事(重庆)工程技术有限公司

海事/船运

专注于海事和离岸产品行业

关于我们

固蓝海事专业从事设计、制造船舶靠泊、系泊设备,主要包括:快速脱缆钩、系船柱、橡胶护舷、舷梯等产品。 产品主要出口欧洲、中东、东南亚和南美国家。

网站
www.glenengineering.com
所属行业
海事/船运
规模
11-50 人
总部
Chongqing
类型
私人持股
创立
2004

地点

  • 主要

    NO.145, Songpai Road, Yubei District

    CN,Chongqing,401120

    获取路线

固蓝海事(重庆)工程技术有限公司员工

动态

  • Mooring bollard and marine fender systems can be pre-installed by their holding down bolts, which are embedded into the concrete or steel structures of the quay or dock. This approach ensures proper alignment and secure anchorage before the full installation process. Once the holding down bolts are in place, the main components, such as the bollard body or fender panel, can be carefully positioned and fastened. GLEN can prioritize the delivery of these hold-down bolts to help reduce site construction time when needed. Proper pre-installation procedures, including accurate alignment, torque settings for bolts, and inspection of materials, are essential to maximize the durability and performance of these critical maritime infrastructure components. Regular maintenance and inspections post-installation are also crucial to extend their service life and maintain safety standards. Know more at glenengineering.com   #PreInstallation #Bollard #FenderSystem #HoldDownBolt #GLEN

    • 该图片无替代文字
    • 该图片无替代文字
  • GLEN quick release hook main parts, such as hooks and side plates, are machined by CNC, ensuring precision, durability, and consistency in every component. Our commitment to high-quality manufacturing processes guarantees that these hooks meet the rigorous demands of marine and industrial applications.   With CNC machining, we can achieve tight tolerances, reducing the risk of failure and enhancing safety in critical operations. This meticulous approach not only ensures reliability but also prolongs the lifespan of our products.   At GLEN, innovation and quality go hand-in-hand to deliver products that stand up to the toughest challenges. Whether for mooring, towing, or other heavy-duty tasks, our quick release hooks are engineered to perform seamlessly when it matters most.   Know more at glenengineering.com   #QualityManufacturing #QRH #QuickReleaseHook #CNC #Machining

  • 6 sets of buoy quick release hook have been completed, packed, and are ready for delivery. The QRH will be installed on the buoy, equipped with anti-rope slip devices (keepers) specifically designed to securely hold the ropes in place. These devices prevent accidental disengagement during operations or fluctuations caused by sea waves. Their addition significantly enhances the safety and functionality of the quick-release hooks, particularly under high-tension or dynamic conditions. After installation, the hooks will streamline mooring and disconnection procedures, providing a reliable solution for maritime operations. Know more at glenengineering.com #Buoy #QuickReleaseHook #QRH #GLEN #Keeper

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • As we navigate the tides of a dynamic industry, this holiday season is a time to anchor ourselves in gratitude. From the offshore rigs to the vessels ensuring energy reaches every corner of the world, your dedication keeps the world moving. This Christmas, we celebrate the resilience, teamwork, and innovation that define our marine oil & gas family. Wishing you calm seas, safe journeys, and cherished moments with your loved ones. 🎅 Merry Christmas and a prosperous New Year! 🌟

    • 该图片无替代文字
  • Four 80-ton quick release hook components were completed and delivered. These hooks were designed to replace damaged units from a different brand. To meet the client's requirements, we customized the design to match the original hook base, ensuring seamless on-site assembly. The customization process involved precise engineering and fabrication to ensure compatibility with the existing infrastructure. Extensive quality control checks were conducted at each stage to guarantee the hooks met the required safety and performance standards. Upon completion, the hooks underwent rigorous testing, including load and functionality assessments, to ensure they were ready for operational use. All hooks successfully passed the load tests, which were witnessed and verified by the LR inspector. The client expressed satisfaction with the final product, highlighting that our customized design enabled a seamless replacement without requiring any modifications to the site assembly. Know more at glenengineering.com #Customized #Design #Hook #Replacement #LoadTest #LR #QuickReleaseHook #QRH #GLEN

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • A total of 12 sets of quick release hooks were successfully installed at Gdańsk Port, Poland. The installation process involved careful coordination with the local teams to ensure all safety protocols were followed and the QRHs were securely mounted to the designated mooring points. All quick release hooks are integrated with capstans, remote release systems, and load monitoring. The remote release and load monitoring systems are connected to the central monitoring system in the control room. The integration ensures real-time data tracking, providing operators with immediate feedback on the load status and the ability to remotely release the hooks if necessary. This setup enhances safety and operational efficiency by allowing for quicker responses in dynamic or emergency situations. The central monitoring system in the control room continuously monitors the performance of each hook, offering both visual and audible alerts if any irregularities or faults are detected. This system improves the overall management of mooring operations, reduces the risk of human error, and increases the port's ability to handle vessels safely and efficiently. GLEN provided comprehensive service and support for this project, which is scheduled to run in 2025. Know more at glenengineering.com #QuickReleaseHook #QRH #Installation #PortOperation #Support

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
      +1
  • After a lengthy sea journey, our supplied bollards and fenders have arrived at the project site. Total 62 sets of unit element fender system (leg fender system) and 66 sets of T-head bollard are being installed on site. The installation process is progressing smoothly, with the team working diligently to ensure all components are securely placed and aligned. These essential marine infrastructure elements are crucial for the safety and efficiency of the port operations. Once completed, the fender systems will provide optimal protection for vessels during docking, while the T-head bollards will offer reliable mooring points to handle varying loads. We expect the installation to be finalized within the coming months, and the site will be fully operational soon after. GLEN's Installation and Maintenance Manual ensures that the installation process is carried out correctly and without any risks. The manual provides detailed, step-by-step instructions, covering all aspects of the installation, from preparation to final checks. By following these guidelines, the installation team can maintain high standards of safety and quality, minimizing the risk of errors and ensuring long-term reliability of the systems. Additionally, the manual includes maintenance recommendations to support the ongoing performance and longevity of the bollards and fenders, ensuring they remain in optimal condition throughout their service life. Know more at glenengineering.com #Bollard #Fender #Installation #Manual #FenderSystem #GLEN

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
      +1

相似主页