Deca projects: 2024 | 🇸🇪 Northvolt, Skelleftea (Sweden) Operation POLAR BEAR… We’re proud to show you an update of the panels that we’re making for the Swedes, on which the our guys and engineers are putting the maximum effort to make them satisfied. Will be mounted to control an NMP recovery system to the “the arctic circle”, therefore heated traces everywhere and materials suitable for low temperatures! During the daily meetings with them we are able to show the progresses, at the same time they’re happy to modify or propose different solutions…obviously when everything is mounted, coincidentally. (this happens when there are too many minds involved) Is all a mount and dismount on course, not a problem because we’re putting (like always) the passion and meticulosity which are the elements that distinguish us. Finally, we hope to finish them till this summer, then we will be able to ship them in Sweden and carry out the installation of the plant. Keep on following us to see how it will end… #processplants #oilandgas #petrochemical #poweringprogress #recoverysystem #mechanical #engineering #heatexchanger #mechanicalengineering #mechanicalengineer #constructionmanagement #flexiblepackaging #chemicalindustry #ingegneria #electricalengineering #adsorption #scrubber #watertreatmentplant #gigafactory #engineeringprocurementconstruction #chemicalengineering #industrialplant #impiantichimici #impiantiindustriali #ingegneriameccanica #ingegneriaindustriale
DECA Impianti
Edilizia
Busto Arsizio, VA 14 follower
ELECTRICIANS FOR REAL 🔋 | Electrical Engineering | Electrical & Software contractor |
Chi siamo
You need to build an industrial plant at the North Pole and the client is starting to ask questions regarding the electrical and software parts? No problem, this is exactly what we have been doing for over 50 years, developing projects from start to finish for a wide range of industries. Here are some key facts about our company: - 500+ completed projects - 315.000kW+ (315MV) managed by our electrical panels - 4.000.000km+ of installed cables - 7.000+ motors connected - 20.000+ valves connected and controlled - 35.000+ instruments connected and controlled Since its beginnings in 1970, Deca Impianti has positioned itself well in the industrial electrical engineering sector, mainly through retaining satisfied clients, having established excellent relationships and an attitude of being a partner rather than just a supplier. In terms of projects designed and assembled at end customers' sites, referring only to industrial chemical plants, we have over 200 projects currently operational around the world, with dozens of satisfied end customers to whom we have managed to convey our passion for what we do. The main sectors for which we carry out electrical projects are: - Solvent recovery units - Regenerative thermal oxidisers - Vapor recovery units (VRU's) on fuel depots (Petrochina, Nayara, Eni, Total ERG etc.) - DMF recovery units - Chlorine liquefaction units - NMP recovery units Each client primarily means problems (in a good way), new relationships with people, emotions, and especially the final satisfaction once the work is completed. This is a bit like the "drug" that drives us to always do more, to take risks... there isn't really a specific reason why we do it, it's simply a world apart that we live in. Feel free to write to us at the email address below for any inquiries: (don't worry, we are used to impossible or desperate requests): E-mail: mail@decaimp.it
- Sito Web
-
https://decaimp.it/
Link esterno per DECA Impianti
- Settore
- Edilizia
- Dimensioni dell’azienda
- 11-50 dipendenti
- Sede principale
- Busto Arsizio, VA
- Tipo
- Società di persone
- Data di fondazione
- 1970
Località
-
Principale
Via Novara,64
Busto Arsizio, VA 21052, IT
Dipendenti presso DECA Impianti
Aggiornamenti
-
2024 | 🇦🇹Isovolta, Werndorf (Austria) 🇮🇹ITA cit. “i maghi solitamente cercano di tirar fuori il coniglio dal cilindro, io invece sto cercando di tirar fuori un elettricista!” (nostro manager ad un cliente) Dall’italiano al portoghese, dallo svedese all’arabo, dal polacco al tedesco, è incredibile la quantità di persone con le quali si ha a che fare in questo settore… è un po uno dei lati positivi del mestiere oserei dire, si ha la possibilità di vedere il mondo nel vero senso della parola. Alla luce del sole un altro progetto, ecco l’impianto elettrico ultimato per questo “Ossidatore Termico Rigenerativo + Scambiatore di Calore” posizionato esattamente sul tetto dell’azienda…a 9mt d’altezza. Più si va a nord e più sono pignoli, da considerarsi quale regola generale, possiamo dire di aver soddisfatto i voleri dell’austriaco anche questa volta, essendo noi la reale dimostrazione del fatto che affidarsi a ditte serie significa evitare rogne in futuro. 🇬🇧ENG Quote: "Wizards usually try to pull a rabbit out of a hat; instead, I'm trying to pull out an electrician!" (our manager to a client) From Italian to Portuguese, Swedish to Arabic, Polish to German, it's incredible the number of people you deal with in this industry... it's one of the perks of the job, I would say, as you get the chance to truly see the world in every sense of the word. In broad daylight, another project has come to completion: here’s the finished electrical system for this "Regenerative Thermal Oxidizer + Heat Exchanger" positioned right on the company's rooftop... 9 meters above ground. The further north you go, the pickier they get—this can be considered a general rule. We can say that we have satisfied the Austrian's demands once again, as we are living proof that relying on serious companies helps avoid problems down the road. #processplants #oilandgas #petrochemical #poweringprogress #recoverysystem #mechanical #engineering #heatexchanger #mechanicalengineering #mechanicalengineer #constructionmanagement #flexiblepackaging #chemicalindustry #ingegneria #electricalengineering #adsorption #scrubber #watertreatmentplant #gigafactory #engineeringprocurementconstruction #chemicalengineering #industrialplant #impiantichimici #impiantiindustriali #ingegneriameccanica #ingegneriaindustriale #environmentalservices #innovation #airpollutioncontrol #processengineering #chemicalindustry #chemicalplants
-
Deca projects: 2024 | 🇮🇹Luxottica S.p.A., Lauriano (Italy) 🇮🇹ITA Siamo a presentarvi una delle nostre ultime forniture elettro-pneumatiche a servizio di questo Ossidatore Termico rigenerativo + Rotoconcentratore, presso Luxottica. Per questo progetto abbiamo ricevuto i complimenti da parte del cliente finale (cosa assai rara in questo settore), risultato della maniacalità con la quale trattiamo anche e soprattutto il lato estetico. Generalmente i nostri clienti “passano a noi la palla” già dal momento in cui ricevono domande o delucidazioni circa il progetto elettrico (tipologia di installazione, assorbimento delle utenze etc.), sapendo di rivolgersi ad un partner esperto e perfettamente in grado di gestire direttamente i clienti finali meticolosi. Il periodo attuale è caratterizzato da un BOOM di richieste per questa tipologia di impianti in particolare, ecco che noi come Deca siamo ben pronti a spazzare il vostro progettista/fornitore elettrico per potervi offrire una collaborazione di livello. p.s. il mio inglese non è perfetto, spero comunque che gradiate quanto realizzato. 🇬🇧ENG We are pleased to present one of our latest electro-pneumatic supplies for a Regenerative Thermal Oxidizer + Rotoconcentrator, installed at Luxottica. For this project, we received compliments from the end client (a rare occurrence in this sector), a testament to the meticulous attention to detail with which we handle, above all, the aesthetic aspect. Typically, our clients “pass the ball” to us as soon as questions or clarifications arise regarding the electrical design (type of installation, power consumption, etc.), knowing they can rely on an experienced partner fully capable of managing even the most detail-oriented end clients. The current period is marked by a BOOM in demand for this specific type of system. As Deca, we are ready to outshine your current electrical designer/supplier to offer you a top-level collaboration. P.S. My English is not perfect, but I hope you appreciate what we have achieved. #processplants #oilandgas #petrochemical #poweringprogress #recoverysystem #mechanical #engineering #heatexchanger #mechanicalengineering #mechanicalengineer #constructionmanagement #flexiblepackaging #chemicalindustry #ingegneria #electricalengineering #adsorption #scrubber #watertreatmentplant #gigafactory #engineeringprocurementconstruction #chemicalengineering #industrialplant #impiantichimici #impiantiindustriali #ingegneriameccanica #ingegneriaindustriale #environmentalservices #innovation #airpollutioncontrol #processengineering #chemicalindustry #chemicalplants
-
2024 | 🇨🇿Amcor Flexibles CZ, Novy Bydzov (Czech Republic) 🇮🇹ITA Domanda: “cos’ha di tipico la Repubblica Ceca?” - risposta del ns manager “Le fighe…” Eccoci balzati in un paese che, nonostante sia in grado di attirare milioni di turisti grazie alla splendida città di Praga, uno spettacolo d’arte, viene da noi italiani ricordata perlopiù per la non-arte sopracitata 😊 Un altro Ossidatore Termico Rigenerativo montato anche qui, solito sistema a Junction Boxes montate in campo, tanto freddo ed altrettanti addetti alla sicurezza impegnati nel seguire ognuno passo passo… - che poi sia bruciata una macchina da stampa causando il panico più totale rimane un dettaglio - 🇬🇧ENG Question: "What’s typical about the Czech Republic?" our manager asked. Answer: "The women..." And here we are, in a country that, despite attracting millions of tourists thanks to the magnificent city of Prague—a true masterpiece of art—is mostly remembered by us Italians for quite different “masterpieces.” 😊 Another Regenerative Thermal Oxidizer installed here, with the usual system of field-mounted Junction Boxes. Bitterly cold and plenty of security staff, all following us every step of the way… – that a printing press caught fire, causing complete panic, is just a minor detail! – #processplants #oilandgas #petrochemical #poweringprogress #recoverysystem #mechanical #engineering #heatexchanger #mechanicalengineering #mechanicalengineer #constructionmanagement #flexiblepackaging #chemicalindustry #ingegneria #electricalengineering #adsorption #scrubber #watertreatmentplant #gigafactory #engineeringprocurementconstruction #chemicalengineering #industrialplant #impiantichimici #impiantiindustriali #ingegneriameccanica #ingegneriaindustriale #environmentalservices #innovation #airpollutioncontrol #processengineering #chemicalindustry #chemicalplants
-
2024 ⛽️ | 🇮🇹ENI S.p.A. - Milazzo Refinery (Italy) 🇮🇹ITA cit. “I lavori nè iniziano, nè vanno avanti, nè finiscono da soli…vanno seguiti 🤣” (riferendosi al modus operandi nei depositi) Eccoci ad una nuova installazione elettrica su un VRU (Unità di Recupero Vapori) presso la Raffineria di Milazzo, Sicilia. L’impianto, per il quale abbiamo fornito progetto elettrico, quadri di controllo e potenza, materiali e montaggi presso il cliente, è così composto: - Sezione di Adsorbimento, composta da n.2 letti di carbone attivo - Sezione di Rigenerazione, composta da n.1 gruppo pompa vuoto - Sezione di Abbattimento, composta da n.1 torre di abbattimento - Sezione Loop Benzina, composta da n.2 pompe per ingresso e ritorno benzina, con relative valvole di intercetto Anche qui utilizziamo il solito sistema a Junction Boxes, sostanzialmente partendo con i multicavi dal quadro di controllo e potenza (MCP) per poi, interconnessi alla JB, ultimare i cablaggi con cavi singoli collegandoci alle apparecchiature finali a bordo unità. L’intera installazione bordo unità risulta installata in zona classificata ATEX, perciò realizzata con materiali idonei e solita attenzione ai criteri di sicurezza, facendo riferimento alle Norme CEI EN 60079. p.s. nelle ultime immagini potrete sbirciare qualche pagina di progetto da noi realizzata 🇬🇧ENG Welcome to a new electrical installation on a VRU (Vapor Recovery Unit) at the Milazzo Refinery, Sicily. The system, for which we supplied the electrical design, control and power panels, materials, and assembly at the client's site, consists of: - Adsorption Section, made up of 2 activated carbon beds - Regeneration Section, with 1 vacuum pump group - Scrubbing Section, with 1 scrubbing tower - Gasoline Loop Section, with 2 pumps for inlet and return gasoline, along with their respective shut-off valves Here too, we use the usual system with Junction Boxes, essentially starting with multicore cables from the control and power panel (MCP), then, interconnected to the JB, completing the wiring with single cables connected to the final onboard equipment. The entire onboard installation is located in an ATEX classified zone, therefore it is built with suitable materials and the usual attention to safety criteria, following CEI EN 60079 standards. P.S. In the last images, you can take a peek at a few pages of the project we've completed. #processplants #oilandgas #petrochemical #poweringprogress #recoverysystem #mechanical #engineering #heatexchanger #mechanicalengineering #mechanicalengineer #constructionmanagement #flexiblepackaging #chemicalindustry #ingegneria #electricalengineering #adsorption #scrubber #watertreatmentplant #gigafactory #engineeringprocurementconstruction #chemicalengineering #industrialplant #impiantichimici #impiantiindustriali #ingegneriameccanica #ingegneriaindustriale
-
+ 8
-
2024 🔥 | 🇵🇱Amcor Flexibles - Zlotow (Poland) 🇮🇹ITA cit. (direttive aziendali) “alle 17 farà buio, e che ci posso fare io?…accendete la torcia per l’amor di dio, allora in Svezia che faremo 4 ore al giorno di lavoro?” Incomincia l’installazione elettrica anche per questo Ossidatore Termico Rigenerativo vicino al Mar Baltico, nord della Polonia. Si tratta del secondo installato sempre da noi, nella stessa sede d’azienda, il primo perfettamente funzionante ultimato nel 2017…evidentemente il cliente è rimasto soddisfatto dell’operato. Conti alla mano dovrebbe essere il 50esimo combustore per il quale abbiamo fornito progetto elettrico, montaggi e attività di start-up. Oramai nella scala gerarchica delle commesse Deca si tratta degli ultimi in ordine di importanza…giocattoli ecco, per la loro “semplicità” di realizzazione. 🇬🇧ENG quote (company directives) ‘at 5 p.m. it will be dark, and what can I do about it...turn on the torch for God's sake, then in Sweden we will work four hours a day?’ The electrical installation also begins for this Regenerative Thermal Oxidizer near the Baltic Sea, north of Poland. This is the second one installed by us, at the same company site, the first fully functional one completed in 2017... evidently the customer was satisfied with the work. Counting in hand, this should be the 50th combustor for which we have provided electrical design, assembly and start-up activities. By now, in the hierarchical scale of Deca orders, these are the last in order of importance...toys here, due to their ‘simplicity’ of construction. #processplants #oilandgas #petrochemical #poweringprogress #recoverysystem #mechanical #engineering #heatexchanger #mechanicalengineering #mechanicalengineer #constructionmanagement #flexiblepackaging #chemicalindustry #ingegneria #electricalengineering #adsorption #scrubber #watertreatmentplant #gigafactory #engineeringprocurementconstruction #chemicalengineering #industrialplant #impiantichimici #impiantiindustriali #ingegneriameccanica #ingegneriaindustriale
-
2024 🧪 | 🇦🇺CLU - De Nora (Australia) 🇮🇹ITA Il motto del nostro titolare è “che cazzo ci vuole, son 4 segnali, ci avessi messo mano io in 2 giorni era finito tutto”...sembra divertente ma è la verità 🤣 Siamo giunti alla fase finale, quella del test segnali presso la nostra officina per queste cassette di interconnessione, a servizio di un “impiantone” di liquefazione cloro (Chlorine Liquefaction Unit), in Australia. Potete notare, in prima battuta, il nostro top manager mentre mi accusa (scherzosamente) di copiare il suo “know how”, servito alla loro realizzazione. In seconda battuta invece i nostri tecnici all’opera, si tratta di una simulazione che ha lo scopo di testare la corretta ricezione dei segnali in ingresso ed uscita a PLC, in parole povere un test dei cablaggi prima della spedizione. Le “junction box” verranno poi montate in campo, presso il cliente finale oltreoceano ed interconnesse al quadro di controllo principale, a cui seguiranno i successivi infilaggi dei cavi di potenza e segnali a valvole, motori e strumentazione, per poi concludere con l’avviamento. 🇬🇧ENG The motto of our owner is, “What the hell does it take? It’s just 4 signals. If I had handled it, it would have been done in 2 days.” It sounds funny, but it’s the truth. We have reached the final phase, the signal testing at our workshop for these interconnection boxes serving a Chlorine Liquefaction Unit in Australia. You can first see our top manager jokingly accusing me of copying his “know-how” that was used for their creation. Next, our technicians are at work; this is a simulation aimed at testing the correct reception of incoming and outgoing signals to the PLC. In simple terms, it’s a wiring test before shipping. The junction boxes will then be installed on-site at the final client overseas, and interconnected to the main control panel. This will be followed by the subsequent cabling for power and signal to valves, motors, and instrumentation, culminating in the start-up. #processplants #oilandgas #petrochemical #poweringprogress #recoverysystem #mechanical #engineering #heatexchanger #mechanicalengineering #mechanicalengineer #constructionmanagement #flexiblepackaging #chemicalindustry #ingegneria #electricalengineering #adsorption #scrubber #watertreatmentplant #gigafactory #engineeringprocurementconstruction #chemicalengineering #industrialplant #impiantichimici #impiantiindustriali #ingegneriameccanica #ingegneriaindustriale
-
2024 🔥 | 🇦🇹 Isovolta, Werndorf (Austria) 🇬🇧ENG A brief overview of the electrical system nearing completion, serving a Regenerative Thermal Oxidizer with Heat Recovery at an Austrian customer’s site. We always aim to highlight aesthetics, striving to make the electrical installation blend seamlessly with the mechanical system, almost as if they were one. Some might think that aesthetics don't matter in the construction of this type of system, but in reality, it is precisely what catches the end customer's eye at first glance. 🇮🇹ITA Una breve visione dell’impianto elettrico in fase di ultimazione, a servizio di un Ossidatore Termico Rigenerativo con Recuperatore di Calore presso un cliente austriaco. Puntiamo sempre nel dare rilievo all'estetica, cercando di rendere l’installazione elettrica uniforme, quasi un tutt’uno, a quella meccanica. Alcuni potrebbero pensare che l’estetica non conti nella realizzazione di questo tipo di impianti, in realtà è proprio ciò che a prima vista attira l’attenzione del cliente finale. #processplants #oilandgas #petrochemical #poweringprogress #recoverysystem #mechanical #engineering #heatexchanger #mechanicalengineering #mechanicalengineer #constructionmanagement #flexiblepackaging #chemicalindustry #ingegneria #electricalengineering #adsorption #scrubber #watertreatmentplant #gigafactory #engineeringprocurementconstruction #chemicalengineering #industrialplant #impiantichimici #impiantiindustriali #ingegneriameccanica #ingegneriaindustriale
-
2023 | 🇮🇳 Balaji Multi-Flex, Gujarat (India) 🇬🇧ENG For our "long-standing" client, our electrical engineers are working on defining the cable routes on the 3D design received. This will then be handed over to the technicians who will build the system in India during 2024. P.S. Apologies for the mess, but it's quite a crazy time, with many projects to manage simultaneously... it's the “order to the busy chaos” for those in the field. 🇮🇹ITA Per il nostro cliente “storico”, i nostri ingegneri elettrici all'opera nella definizione delle vie cavi sul disegno in 3D ricevuto. Questo verrà poi consegnato ai tecnici che realizzeranno l’impianto in India, durante questo 2024. P.S. perdonate il disordine, ma si tratta di un periodo alquanto folle, caratterizzato da molte commesse da seguire in contemporanea…si tratta “dell’ordine nel disordine” per chi è del mestiere. #processplants #oilandgas #petrochemical #poweringprogress #recoverysystem #mechanical #engineering #heatexchanger #mechanicalengineering #mechanicalengineer #constructionmanagement #flexiblepackaging #ingegneria #electricalengineering #chemicalindustry #adsorption #scrubber #watertreatmentplant #gigafactory #engineeringprocurementconstruction #chemicalengineering #industrialplant #impiantichimici #impiantiindustriali #ingegneriameccanica #ingegneriaindustriale
-
Deca history: 2009 | 🇵🇹 Amcor Flexibles PT, Seixezelo (Portugal) 🇬🇧ENG With more than 68 electrical projects delivered just for solvent recovery units all around the world, we can consider ourselves a leading company in this specific field! We list some technical details about what we’ve installed, for which we’ve provided the entire project that includes: - Detailed engineering (electrical drawings, electrical and pneumatic installation manuals, cable trays routing etc.) - Electrical project (electrical panels declaration of conformity, installed electrical plant decl. of conformity, hazardous areas classification etc.) - Power and control panels (made in our workshop) - Electrical and pneumatic installation Installed power: - Adsorption blower motor: 250kW (420A) VFD - Regeneration blower motor: 45kW (79A) VFD - Dehydration system blower motor: 7.5kW (15.5A) VFD - Chiller motor (Trane): 220kW (408A) DOL - Glycol water motor: 15kW x2 (27A) DOL - Cooling tower blower motor: 22kW (39A) DOL - Evaporative condenser motor: 3kW (6.6A) DOL - Tower H2O pump motor “A”: 22kW (39A) DOL - Tower H2O pump motor “B”: 22kW (39A) DOL - Tower antifreeze resistances: 4kW (6A) DOL - Diathermic oil pump motor: 7.5kW (15.5A) VFD - Distillery oil pump motor A/B: 7.5kW x2 (13.8A) DOL - Distillery column load motor pumps. “A/C”: 0.75kW x2 (1.8A) VFD - Distillery column load pump motor “B”: 4kW (8.4A) VFD - Distillery column reflux pump motor.: 4kW (8.4A) VFD - GC sampling lines motors: 0.18kW x2 (0.64A) VFD - Rolling filters motors A/B/C: 0.18kW x3 (0.7A) DOL - Heat recovery pump motors ”A/B”: 4kW x2 (8.5A) DOL Installed valves: - n.60 ON/OFF valves with limit switch and solenoid - n.18 modulating valves with electro-pneumatic positioner - n.1 electrovalve Installed instrumentation: - n.58 temperature transmitters - n.15 pressure transmitters - n.15 level transmitters - n.16 flow transmitters - n.1 differential pressure transmitters - n.2 pressure switches Analyzers: - n.1 O2 concentration analyzers - n.2 CO/CO2 analyzers - n.1 gas chromatograph analyzer - n.1 LEL analyzer Total installed power: 1.520kW (2.240A) Plant extension: 1.240m2 Duration of the installation and start-up: 2 months Want the better quality and cost-effective solution for your industrial plants, feel free to contact our enginnering team ready to meet your requests! #processplants #oilandgas #petrochemical #poweringprogress #recoverysystem #mechanical #engineering #heatexchanger #mechanicalengineering #mechanicalengineer #constructionmanagement #flexiblepackaging #ingegneria #electricalengineering #chemicalindustry #adsorption #scrubber #watertreatmentplant #gigafactory #engineeringprocurementconstruction #chemicalengineering #industrialplant #impiantichimici #impiantiindustriali #ingegneriameccanica #ingegneriaindustriale
-
+ 12