Rem Inspector Moves Toward Enhanced Efficiency and Reduced Emissions with 1MW QUEST® Energy Storage System Installation 🔋
⚡ We are proud to power up Rem Inspector with our cutting-edge energy storage system for Rem Offshore! ⚡ 🔋 We will integrate and deliver a 1 MW battery package featuring our QUEST® energy storage system. The containerised battery system optimises energy use by enabling peak shaving, spinning reserve, and harbour mode. ⚙️ By integrating batteries into the REM Inspector, we reduce the number of diesel generators in use while maintaining DP class, resulting in significant operational cost savings while reducing emissions. 💬 “NES has a strong track record of delivering energy storage systems to offshore vessels, which is why we have chosen them as a cooperation partner for the Rem Inspector," says Lars Conradi Andersen, CEO of Rem Offshore By retrofitting existing vessels with energy storage systems, they aim to reduce fuel consumption and emissions while maintaining operational reliability. 💬 "Reducing energy consumption on offshore vessels is achieved through several measures, including integrating battery storage, energy management systems, and optimised propulsion. These efforts lead to cost savings and lower emissions," says Siv Remøy-Vangen, managing director of Norwegian Electric Systems. 🌍 Rem Offshore is fully committed to retrofitting its fleet for greener operations, and we're excited to be part of their journey. #RaisingTheBar