Lakeside Energy Limited

Lakeside Energy Limited

Renewable Energy Power Generation

Karachi, Sindh 557 followers

About us

Lakeside Energy Limited, a 50MW wind power project located in Jhimpir Wind Corridor in the province of Sindh, Pakistan consists of 345 acres of land. Construction of the project commenced on 15 July 2020. Whereas, commercial operation started on 14 April 2022. Project is developed as an Independent Power Producer (IPP) under cost-plus tariff regime awarded by National Electric Power Regulatory Authority (NEPRA). Project has entered into an Energy Purchase Agreement for a term of 25 years to sell all of its generated green energy to Central Power Purchasing Agency (Guarantee) Limited Project has installed 25 Siemens-Gamesa G114-2.0 wind turbine generators (WTG) with hub height of 93 meters and a rotor-diameter of 114 meters. An air insulated switchgear step-up substation (33/132 kV) is built to transmit electrical power to national grid. The construction (onshore) contract was awarded to HydroChina International Engineering Company Limited Pakistan however, the supply (offshore) contract was awarded to Hangzhou Huachen Electric Power Control Company Limited. Project conforms to IFC performance standards for Environmental & Social compliance.

Industry
Renewable Energy Power Generation
Company size
51-200 employees
Headquarters
Karachi, Sindh
Type
Public Company
Founded
2020

Locations

  • Primary

    B-21, Block 7/8, Banglore Town, Main Shahra – e – Faisal,

    Karachi, Sindh, PK

    Get directions
  • Deh Kohistan 7/3 and 7/4, Tapo Jungshahi Taluka and District

    Thatta, Sindh, PK

    Get directions

Employees at Lakeside Energy Limited

Updates

Similar pages