Yesterday we welcomed the Mayor of London Sadiq Khan and the Rt Hon Steve Reed MP, the Environment Secretary, to our new public space along Victoria Embankment . Learn more here: https://ow.ly/EG2R50TqKi9
Tideway London
Construction
London Bridge, London 43,043 followers
We're building the #SuperSewer for future generations and reconnecting London with the River Thames
About us
Tideway's Super Sewer is upgrading London's infrastructure to cope with demands well into the 22nd century and reconnecting the city with the iconic River Thames. The Thames Tideway Tunnel is a 25 kilometre interception, storage and transfer tunnel running up to 65 metres below the river. Starting in west London, the main tunnel generally follows the route of the River Thames to Limehouse, where it then continues north-east to Abbey Mills Pumping Station near Stratford. There it will be connected to the Lee Tunnel, which will transfer the sewage to Beckton Sewage Treatment Works. Overflows of untreated sewage into the River Thames add up to tens of millions of tonnes every year. London's sewerage system relies on an integrated network of combined sewer overflows (CSOs). At the time it was built, the CSOs would release flows through discharge points along the river during heavy storms. Originally, this would happen once or twice a year, it now happens on a weekly basis and no longer requires a storm to trigger overflows. By intercepting the sewage before it enters the river, the Thames Tideway Tunnel will help prevent the River Thames from being polluted with untreated sewage which can stay in the river for up to three months before the ebb and flow of the tide finally takes it out to sea. For more information, visit our website www.tideway.london Tideway Inclusive Recruitment statement: We are one of The Times Top 50 Employers for Women, a Stonewall Diversity Champion, a proud signatory of the ‘Ban the Box’ campaign, and Disability Confident Committed Employer. We pride ourselves on providing employment for disabled employees, providing support and adjustments during the recruitment process, and wherever needed in the working environment. We offer a guaranteed interview scheme for suitably qualified disabled applicants.
- Website
-
http://www.tideway.london
External link for Tideway London
- Industry
- Construction
- Company size
- 501-1,000 employees
- Headquarters
- London Bridge, London
- Type
- Privately Held
- Specialties
- Waste water services, engineering, civil engineering, and infrastructure
Locations
-
Primary
110 Southwark Street London
6th Floor Blue Fin Building
London Bridge, London SE1 0SU, GB
Employees at Tideway London
-
Stuart Grant
Commercial Project leader/Director for complex infrastructure projects. Chartered Civil Engineer.
-
John Sage
Head of Corporate Responsibility at Tideway and Trustee at London Youth Rowing
-
Natalia Jones, MBA
Major Projects | Programme Management | Transformation | Strategy | Compliance | Stakeholder Management | Sustainability
-
ParvezAhmad Shaikh
Head of Planning at Thames Tideway/ Planning Expert Jacobs
Updates
-
Tideway London reposted this
London’s rivers have been neglected and damaged by pollution for too long. That’s why we’re bringing partners together to clean up the capital’s rivers. I visited the Thames Tideway project with Secretary of State Steve Reed.
-
The Active Thames programme is co-ordinated by Port of London Authority encourages communities to get active – on (or beside) the River Thames and its inland waterways. Tideway is injecting additional funding to mark the year in which the project begins protecting the river from pollution for the first time. To find out more, we visited the Parkinson's UK Greenwich Support Group to take a walk by the river, and dropped in on the Shadwell Basin Outdoor Activity Centre where young people get a chance to get out on the water. Check out the full video here: https://ow.ly/xyCU50TpMMq
-
We've made it to the finals! 🎉🤞 #ITATunnellingAwards 🏆
🏆 #ITATunnellingAwards 🌟 Announcing the Finalists for the "Major Project of the Year" category! 🌟 We are thrilled to reveal the four groundbreaking projects competing for the prestigious title of "Major Project of the Year" in this year's competition. These finalists showcase the pinnacle of engineering innovation, complexity, and global impact. ✅ Chunfeng Tunnel – Single-Bore, Double-Deck Municipal Tunnel in Shenzhen, China ✅ LIRR Grand Central Madison – New York City Terminal, USA ✅ Thames Tideway Tunnel – London’s New Super Sewer, UK ✅ Thomson-East Coast Line (TEL) – Contracts T222 to T310, Singapore Stay tuned for the winner's announcement and celebrate these monumental achievements with us in Genoa! Registration: https://lnkd.in/dvdCZteR #EngineeringExcellence #GlobalInfrastructure #MajorProjectOfTheYear #Innovation #Sustainability #FutureForward #ProjectFinalists
-
#SuperSewer update🚧 ✅At Albert Embankment, four new benches have been installed on top of the Interception Chamber ✅At Carnwath Road, the team have completed the installation of timber capping ✅At Greenwich Pumping Station, the foundations for the gate onto Norman Road were poured as part of the access road works
-
We've partnered with a number of London charities to support our legacy commitment to inspire people to take part in river activities and attend river-based events 🌊🚣 Learn more about our 'River Reconnection Partnerships' by visiting 'Our Community' page here: https://ow.ly/sBEW50Tm3CV
-
Pictured below is an aerial shot of our Acton Storm Tanks site where we have excavated a 31m-deep shaft and built interception chambers to intercept and redirect existing flows from Stamford Brook sewer into our main 25km sewer. Find out what else we've been up to at this site by visiting our Acton Storm Tanks site page: https://ow.ly/RnUG50TjM5t
-
#SuperSewer update🚧 ✅At Carnwath Road, good progress is being made finishing the landscaping ✅At Blackfriars, the green roof was installed on the circular kiosk structure ✅At Earl pumping station, the above ground interception chamber brick walls is nearly complete
-
Adrian started on the Tideway project as an apprentice and has gone on to become a Project Manager at our Victoria Embankment site right in the heart of London and where we are leaving behind a new public space for Londoners to enjoy. Learn more by watching Adrian's interview here: https://ow.ly/vwz450Tfojq Meet more of the dedicated people behind the project by visiting our 'People Behind the Tunnel' page: https://lnkd.in/e7zmC5WQ
-
Two temporary cofferdams built in the Thames near Blackfriars have now been removed. The structures were built out into the river to give Tideway space to undertake its works. Learn more: https://ow.ly/E1Pg50Tf5Pl