Delivering Project Success
Managing and delivering complex projects is as critical as having the best solutions. We commit to delivering projects flawlessly and on schedule, with a proactive attitude to addressing issues as or ideally before they arise. Our team has deep and broad experience and capabilities delivering projects across the energy industry.
915 MWh
Deployed since 2023
Rudong – Gravity
First-of-its-kind system supporting a wind farm and the national grid system of the world’s largest utility.
- 25 MW
- 100 MWh
- China
01
Stanton – Battery
Maximizing BESS energy density to enable resource adequacy, ancillary services, and bulk renewable energy shifting.
- 68.8 MW
- 275.2 MWh
- California
02
Calistoga - Hydrogen
Pioneering battery-hydrogen fuel cell system providing a community microgrid with continuous power for at least 48 hours.
- 8.5 MW
- 293 MWh
- California
03
Zhangye - Gravity
China's second installment of a Gravity Energy Storage System (GESS) - built to relieve grid congestion and support renewable energy growth.
- 17 MW
- 68 MWh
- China
04
Reid Gardner - Battery
Improving Nevada's grid resilience and enabling excess solar generation to serve demand after the sun sets.
- 220 MW
- 440 MWh
- Nevada
05
St. Gall - Battery
Shifting regional wind and solar generation to stabilize the Texas grid and increasing customer revenue.
- 100 MW
- 200 MWh
- Texas
06
In our customers’ words
There were supply chain issues across the board, but Energy Vault was nonetheless able to promise – and then deliver – the batteries needed for the project.
Hal Dittmer
CEO, Wellhead Electric