Congratulations, UPMC on the 𝗧𝗼𝗽𝗽𝗶𝗻𝗴 𝗢𝗳𝗳 𝗖𝗲𝗿𝗲𝗺𝗼𝗻𝘆. CJL Engineering is excited to be providing 𝗠𝗘𝗣/𝗙𝗣 𝗲𝗻𝗴𝗶𝗻𝗲𝗲𝗿𝗶𝗻𝗴 𝘀𝗲𝗿𝘃𝗶𝗰𝗲𝘀 for the 𝗨𝗣𝗠𝗖 𝗣𝗿𝗲𝘀𝗯𝘆𝘁𝗲𝗿𝗶𝗮𝗻 𝗛𝗼𝘀𝗽𝗶𝘁𝗮𝗹 𝗧𝗼𝘄𝗲𝗿 project. #cjlengineering #mepengineering #fireprotectionengineering #healthcareengineering #pittsburghpa Matthew Sotosky, P.E., Matthew Stevens, Glenn Brown, Adam McKinley, Timothy Bertolino, Jeffrey McKendree, PE, CET, Jaclyn Krawczyk, EIT, LEED AP, Janpaul Villa, 𝗭𝗮𝗰𝗵 𝗞𝗲𝗿𝗿, 𝗥𝗼𝗻 𝗚𝗮𝗶𝗱𝗮
It’s UPMC’s largest construction project ever and the largest current health care construction project in Pennsylvania. Now the new UPMC Presbyterian tower is one step closer to completion, as one of the final structural steel beams settled into place today on the top floor of the 17-story building. When construction completes in late 2026, the 1.2 million square foot project will house 636 private patient rooms, equipped with technological advances that support the exceptional experience of patients and staff. “Setting the last beam is a major milestone in the evolution of a building project,” said Sandy Rader, president, UPMC Presbyterian. “This patient care tower reflects our ongoing commitment to providing the best possible work environment for our staff and life-changing medicine for our patients.” https://lnkd.in/efPnJsPR