Dunnet Bay Construction Company reposted this
Construction Engineering Group Manager-Ciorba Group Chair-ASCE IL Construction Institute ‘23 ASCE-IL Director ‘24-‘25
Setting Stage 2 bridge girders on the Park Avenue West Bridge in Highland Park today. Really threading a needle with this pick and set. In order to maintain vehicular and pedestrian traffic, Stage 2 is sandwiched between the completed Stage 1 bridge deck and 4”(!) from an existing prefab truss pedestrian bridge, proving that sometimes the smaller bridges can be the most difficult. Great display of teamwork between Dunnet Bay Construction Company and Ciorba Group, Inc. to develop and carry out a plan to make this a successful beam erection for the City of Highland Park. Shout out to Ciorba’s Construction Engineer Edgar Alvarado for doing a great job running the show out there!