文晖’s Post

How to use the rotary drilling rig to excavate the square type anti-skid pile? The steps for excavating square anti-slide piles using rotary drilling machines mainly include the following: Firstly, prepare the construction site by clearing the area to ensure safe and convenient equipment operation. Check the pile position coordinates according to the construction drawings, use a total station to accurately set out the pile positions, and mark the four corners. Next, use the rotary drilling machine to drill out the soil in the middle of the square pile hole, and then use specially made corner and edge bits to trim the four corners and sides of the square pile until the designed hole depth is reached. The cutting speed should be stable and uniform to ensure the quality of the formed hole. During the hole-forming process, attention should be paid to the stability of the hole wall to avoid collapse. After hole-forming, perform hole cleaning and measure the depth. Then, place the steel cage and tremie, conduct a second hole cleaning, and finally pour underwater concrete to form the anti-slide pile. #Excavation #HeavyMachinery #ConstructionEquipment #MiningTech #RotaryExcavation #FoundationWork #IndustrialMachinery #SquareExcavation #ConstructionSolutions #EngineeringInnovation

To view or add a comment, sign in

Explore topics