Advance Filtration Group Pty Ltd ’s Post

* WA Hospital Project HEPA Update * On this project we were required to provide HEPA terminals with room side adjustable dampers that offered low turbulence and a uniform air on distribution. - The simple laser cut rack and pinion drives opposing slotted plates. The design enables 0-100% control of design air volume at very low noise levels. - The damper mechanism can be adjusted manually or automatically via an actuator responding to the BMS.  - At the request of our customer, we provided R2 insulation of the cushion heads. We would be delighted to provide you with any additional information you need about the project and product. Visit airfilters.com.au or call (03) 9791 2881. #afg #advancefiltrationgroup #HEPA #damper #laser #insulation #project #innovation #technology #afgproducts #experienceafg