AirQ’s Post

View organization page for AirQ, graphic

3,966 followers

🚀 The Harara Wiring Process: From Blueprint to Flight 🚀 We start with crafting an electrical schematic and transforming it into a detailed 3D CAD model. ✍️ This design becomes a reality as we print the fuselage harness (with our in-house designed jigs for perfect fixation). Along the way, we conduct connection checks, voltage testing, distribution, and pin-to-pin accuracy to ensure everything’s flawless. ⚙️💡 Finally, all that’s left is the physical installation into our aircraft, bringing Harara’s precision to life in the skies. 🌌

Akhil Verma

Senior System Engineer @GreyOrange | Winner at BOEING BUILD (Pi Drones) 2019 | Former Mentor at Boeing Aeromodelling Festival | ABU Robocon 17,18 and 19 (A.K.G.E.C.)

1w

Innovative!

Han Li

Anyang Hawk Aviation Technology Co., Ltd. - Foreign Trade Sales, Focus on propeller and rotor over 24 years

1w

Excellent work!

Like
Reply
See more comments

To view or add a comment, sign in

Explore topics