Ballymore Resources Limited’s Post

Ballymore has released its Quarterly Report for the quarter ended 30 June 2024. Download our Quarterly Report here https://lnkd.in/ghRg_zcn Highlights Dittmer Stage 4 drilling completed with all holes successfully intersecting the targeted Duffer bonanza gold lode. Highlights include: Drill hole DTDD031 2.9m @ 16.01g/t Au Drill hole DTDD034 3.0m @ 19.50g/t Au Drill hole DTDD040 8.0m @ 8.36g/t Au Inc 4.8m @ 13.68g/t Au Inc 0.3m @ 193.45g/t Au Deeper holes such as DTDD039 and DTDD040 continue to suggest the lode structure is widening at depth. Mineralisation remains open along strike and at depth. Initial surface drilling program at Dittmer is underway and is testing the significant geochemical anomaly which may represent an extension of the known copper-gold zone. CEI-funded low level heli-borne gradient magnetic and radiometric survey underway. 

To view or add a comment, sign in

Explore topics