Bond Bryan’s Post

Bond Bryan reposted this

A key element for the refurbishment of the Grade II Listed Central Building includes the complex replacement of the existing PTFE (polytetrafluoroethylene) roof. Check out our drone footage showing the lowering and removal of the original roof 📹 During the replacement, the structure has been supported with temporary rigging and birdcage scaffolding. Repairs and strengthening works to the frame and key components have been carried out. The new roof will include laminated glass and a new large central roof light, allowing plenty of natural light into the building. University of Nottingham AECOM Base Structures UK Ltd Tensys Arup Bond Bryan Gardiner & Theobald LLP #UoN #UniversityofNottingham #CastleMeadowCampus #RoofReplacement #TensileFabric #GradeIIListed #Restoration #Refurbishment #BaseStructures #Engineering #Architecture #Nottingham #NewCampus

Mark Gent

Sales Manager - Structural Support at Mabey Hire

2mo

Fantastic project to be involved with. Utilising our Medium and Heavy Duty props. Thanks to G F Tomlinson and in particular Andy Morris for asking for our help.

To view or add a comment, sign in

Explore topics