𝗦𝘂𝗽𝗲𝗿-𝘀𝗽𝗮𝗻 𝗴𝗮𝗻𝘁𝗿𝗶𝗲𝘀 𝘀𝘂𝗰𝗰𝗲𝘀𝘀𝗳𝘂𝗹𝗹𝘆 𝗶𝗻𝘀𝘁𝗮𝗹𝗹𝗲𝗱 Two super-span gantries were successfully installed over the M25 on Saturday night, marking another milestone on the scheme. The gantries measuring an impressive 44 and 54 metres in lenght, were constructed off-site, stretching over eight lanes of the M25 carriageway and its two slip roads at junction 28. When operational, the gantries will house signs which have the latest technology to keep road users informed and up to date. Zachary Pepper, National Highways Project Manager, said: “This complex operation saw the completion of a series of improvements, allowing road users to safely navigate through this busy junction in the near future. We would like to thank the construction team and the support from the local community in reaching this significant milestone.” Hugh McNally GRAHAM Project Manager said: “Both super-span gantries were installed overnight during a full closure of the M25 in both directions and lifted into position by two 450 tonne mobile cranes, with the carriageway reopened in less than 9-hours, keeping disruption to a minimum for road users. “The safe and successful delivery was a result of precise planning by both the Project Team and Supply Chain, well done to all involved”. National Highways, Nusteel Structures Limited Hugh McNally #GRAHAM #highways #civilengineering
Must have been over budget tho, grahams can’t do anything within budget 🤣🤣🤣
Congrats!
Well Done Graham ye are. The. Best in the business of civil engineering and Heavy Civil s
Electrical Qualified Supervisor at Mason Street Furniture, 2391, C&G Level 3 (2919-1) EV Charging, ECS Approved Highway Electrician, SSSTS, NRSWA, IPAF.
2moIt was some size !