Deepansh Agrawal’s Post

View profile for Deepansh Agrawal, graphic

Looking for a New (Project)

7 days persistent examination (including below listed checks) to finalize the Bridge makes us feel proud to serve for the Nation:- # Span Dimensions # Panel Width # Out of Square Mis-alignment at end # Difference of Top and Bottom Chord Spacing # Height of Vertical Members # Vertical Misalignment of Top and Bottom Chord Members # Camber at Bottom Chord on support # Straightness Check Full length and At 20mtr interval # Node Length Bottom and Top # Sectional Diagonal at Bottom and Top # Inspection of Sole Plate and Bearing # Final Camber Inspection. # Load Cell readings etc.

  • No alternative text description for this image
Indrapriya Bhattacharyya

Structural Steel Heavy Fabrication & Erection Project Management

12mo

What about hole fairness?

Loading Unloading installation Shifting Lifting manually and Load Cell Calibration Contact number 8070809100

Like
Reply
Sumit Basuri

Bridge & Structural fabrication

1y

Great 👏

Like
Reply
See more comments

To view or add a comment, sign in

Explore topics