Embassy Demolition Contractors Ltd’s Post

Project Case Study! Excited to share the successful removal of a pedestrian bridge spanning Flats, marking a significant milestone in the area's major regeneration works. 🏗️🌆 Extensive design and planning alongside the Local Authority ensured smooth logistics every step of the way. Here's a glimpse into our efficient process: 📅 Day 1: Prepared equipment, Sealed off pedestrian access to bridge using in-house fabricated steel, took delivery of plant and set up welfare facilities to ensure a seamless operation the following day. 📅 Day 2: With precision timing, we closed the road at 7 am, installed the road surface protection, swiftly maneuvered the crane into position, and carefully cut and lifted the central bridge section. The bridge was swiftly transported and processed off-site for recycling. Following this the edge sections were lifted down and transported off site for processing. Site clearance completed. 📅 Day 3: An early start ensured the final cleanup, including plywood removal and barrier dismantling. Remarkably, we reopened the road promptly at 7 am, staying within our 24-hour limit and ensuring minimal disruption to the community. Proud of our team's dedication and efficiency in delivering this project on time and with precision. 🙌 #Demolition #Construction #RegenerationWorks #LogisticsExcellence #CommunityImpact 🌟

  • No alternative text description for this image

To view or add a comment, sign in

Explore topics