الحمدللہ ۔ A breakthrough excavation using the New Austrian Tunneling Method (NATM) and the drill-and-blast technique has been successfully achieved for the traffic tunnel (Dasu Tunnel) at the Karakoram Highway (KKH) project. Total Length=1033m #tunneling #tunnelexcavation #tunnel #road #project
Congrats&keep it up bro👌
Civil Engineering Consultant | Decades of Excellence in Global Civil Engineering | Expert in Surveying, Mapping, and 3D Modeling | Infrastructure Innovator | Technology-Focused Advisor
6moI agree with