Exakta’s Post

View organization page for Exakta, graphic

3,038 followers

The Al Dabbiya Thamama B Transition Zone Developments - Phase II is part of the North East Bab (NEB) development program sponsored by #ADNOC Onshore.   The second development of the field is focused on Al Dabbiya (so-called #AlNouf) Transition Zone B and involves the construction of 19 wells, 11 oil producers, and 8 injectors (for 2 new clusters and 3 existing clusters); debottlenecking of the existing water injection system; technical room; power supply skid and associated facilities; 13 km of oil producer pipeline, and 10 km of water injection pipeline.   Exakta is proud to contribute to the realization of this huge project by supplying approximately 70 pump units for #biocide, #corrosioninhibitors, and #scaleinhibitors injection packages destined for the clusters and water supply wells.   Whether for biocide injection to inhibit microbial-induced biofilm, or scale and corrosion inhibitors to mitigate oxidative factors prevalent in the oilfield environment, the #NEXA hydraulic double diaphragm configuration, in both single and multi-head setup, is the ideal solution for improving #processefficiency and protecting equipment.   Once again, the #flexible and #modular design of the Nexa range of metering pumps proves to be the right choice for operators looking to maximise production and ensure #equipmentlongevity. #Exakta #Seko #MeteringPump #DosingPump #ChemicalInjection #API675 #NexaSeries #DoubleDiaphragm #PackedPlunger #HydraulicInnovation #PrecisionMetering #IndustrialSolutions #onshore #UAE

  • No alternative text description for this image

To view or add a comment, sign in

Explore topics