Fäth GmbH reposted this
Fluor signed a Front-end Engineering and Design (FEED) contract with Heidelberg Materials for its GeZero project to integrate an industrial-scale carbon capture and storage solution into its cement production facility in Geseke, Germany. Read more: https://lnkd.in/eb2vVWFf “GeZero is a flagship project for the decarbonization strategy of Heidelberg Materials and Fluor is excited to assist with this pioneering technology,” said Michael Alexander, Group President of Fluor’s Energy Solutions business. “Carbon capture and permanent storage is crucial in meeting sustainability goals.” #BuildingABetterWorld
Impressive work, Fluor and Heidelberg Materials! This collaboration represents a significant step forward in advancing sustainable solutions for the cement industry. Excited to see how the GeZero project sets new standards for carbon capture and storage technology. Congratulations on this milestone.
Congratulations and all the success.
Congrats
Is this actual Fluor or was it thru/with Stork?
Congratulation for this new project.
Great news, congratulations to all the team
Congratulations Fluor Corporation & Heidelberg Materials 🎉👏
Viel Erfolg and very interesting project
Quality Assurance Manager at Fluor Arabia
1moCongratulations for this valuable project. Wish you all the team to keep up the standards of Fluor; even exceed the expectations.