🏗️ New Video🏗️ Griffiths Farrans JV is making excellent progress on its transformational public transport project at Bristol Airport. Since topping out in November, the team has completed the Passenger Transport Interchange steel work on level 4 and has just 3 more pours remaining to complete the structural slab on level 4, followed by stair cores and parapets. The pre-cast link bridge installation commenced last week to connect directly to the existing car park. The 48 metre-long bridge link to the terminal will be visible next month with construction to take place on the ground before it is lifted into place in two sections. #airport #aviation #construction #civilengineering Alun Griffiths (Contractors) Ltd
Loving this, what great footage from the drone, both of the largest concrete pumps in our fleet working side by side. The M52 making it look easy off the boom and the UK’s Largest Concrete Pump the M65-6 reaching with pipeline to the rear of the structure. It’s been a pleasure to supply this project. #pumpwright
Top job Gerard Mcnamee 👌👌
Great progress, it’s really taking shape
What a Team collaborative effort and great success!
Fantastic update, great project, glad to see Kerkstoel precast lattice slabs used as permanent formwork for the floors. In this case the slabs were post tensioned by Interspan.
Hugely impressive development. Passed through recently and really impressed. Congratulations to all involved.
Fantastic Footage ! We are inspired to be part of this outstanding project!