Completed: 32017 Rivard Rd. - Moreno Valley, CA Two buildings each on their own parcel. City zoning required two buildings on 2.32 Acres. GAA proposed a single structure with a shared Fire Wall built on the lot line, which maximized site coverage for the least cost (186' less tilt wall than two separate buildings of the same size). Steel wide flange roof with metal deck utilized due to long lead for roof joists at the time. CDRE Holdings / Compass Danbe Real Estate Partners HSA & Associates, Inc. Air Control Systems Johnson Plumbing Casc Engineering and Consulting, Inc. BCC Contracting, Inc.
you guys are amazing! great work!
Architectural renderings
3moLove this