GBE Group reposted this
Huge milestone achieved by GBE, Multiplex, and Stanhope PLC on the 76 Southbank project today. The South Multiservice Riser has now been installed from the basement to the top floor. This riser houses the building's primary pipework, ductwork, and electrical services, with each double floor module measuring 7m in height, 3.5m x 3.8m in length and width, and 6-tonne dead weight. We worked with a 35mm tolerance within the shaft, making it a significant lift that required precision engineering, detailed planning and clear communication from start to finish. Traditionally, this complete activity would have taken 3 months on site, with multiple trades working in a high-risk open shaft environment. However, the project accomplished this installation in 5 days, having completed all M&E works, floor installation, QA & snagging and test lifts, off-site over the past three months out at GBE’s Modular Division run by George Stollery . A big thank you to Multiplex for their assistance throughout the lift and to Yellow Lizard Media - Video Production for capturing this fantastic video.
Absolutely brilliant work GBE Group 👍
Lovely to see how the collaborative approach between, client, MC and contractor can achieve an efficient and effective method of install and delivery to aid overall project progression, fantastic work!
Significant, great stuff.
Wow that is what we all thought modula would do 20 years ago. Congratulations Kevin & team.
Great work my bru Mike Sullivan 🙌🏼
Well done leading the way
Excellent 👍
Videographer based in St.Albans, Hertfordshire creating bespoke professional video content for a range of industries
7moGreat work as always guys