GeoStabilization International®’s Post

View organization page for GeoStabilization International®, graphic

15,394 followers

Project Highlight: Emergency Mitigation We were contracted by a state DOT for emergency #landslide and rockfall mitigation on a highway. *Phase 1: Rockfall mitigation on a 180-foot-long slope extending 165 feet above the roadway. This included hand and mechanical scaling and tree removal via rope access. *Phase 2: Safety scaling, installation of rock bolts and anchors, pinned mesh, and drape on a 150-foot-long slope extending 165 feet vertically. We drilled exploration holes to determine rock bolt and anchor spacing, installed pinned mesh using rock bolts on the upper vertical feet of the slope, and utilized rope and helicopter access for limited areas. Additionally, we addressed a mobilized rock mass, including a 20-foot sandstone block with safety scaling, cable and post anchors, and hybrid barrier and drape installation. #Engineering #RockfallMitigation #InfrastructureSafety #GeoStabilization #EmergencyResponse #SlopeStabilization

  • No alternative text description for this image
  • No alternative text description for this image
  • No alternative text description for this image
  • No alternative text description for this image
John Metzger

CaaS / Earth Monitoring (EM) and Geomatics / New Business Program Development

3mo

nice little slide ...

Steve Smiltneek

Construction Laborers Unions 169 and 330 1312

3mo

Well done! I'm seeing employment with GeoStabilization in the future.

See more comments

To view or add a comment, sign in

Explore topics