- Case Study Spotlight - Redbridge Council’s - Council Chamber AV refurbishment A new comprehensive conference facility for 80 delegates, complete with voting facilities, sound reinforcement and public induction loop facilities with cables installed under the existing parquet floor of the listed building. 👂What did we do? As the preferred designer and installer, Clarity UK was contracted to supply, install and commission the conference/voting/sound reinforcement and induction loop package in the very prestigious Redbridge Town Hall Council Chambers. Over 80 delegate stations incorporating a smartcard voting slot were installed. Special metalwork was manufactured to enable installation of the delegate units without cutting or drilling into the ornate delegate desks. An events recording PC and software was employed, automatically providing a record of the event, ready for burning onto disc for distribution. Sound reinforcement was provided by individual loudspeakers in each delegate unit, or via a headphone outlet and distributed loudspeakers within the chamber for public listening. A magnetic induction loop system was provided for pickup of the event by delegates or members of the public. An excellent result, as always brought in on time and on budget. Would you like a partner who does the same? I'm looking for consultants, architects, contractors and engineers to discuss their next project with. If this is you, drop me an email giles\@clarityuk.co.uk #AV #AudioLoop #Council #Events
Looks great! Be great If we could call in and give you an update our conference systems, ready for your next amazing project! 😀
Project Manager MIOA, MIET, MInstSCVE at dB Attenuation Ltd
7moGood job, did you install the loop itself or was this already down?