𝗜𝘁 𝗶𝘀 𝗻𝗼𝘄 𝗽𝗼𝘀𝘀𝗶𝗯𝗹𝗲 𝘁𝗼 𝟯𝗗 𝗽𝗿𝗶𝗻𝘁 𝗮 𝗯𝗿𝗶𝗱𝗴𝗲 𝗮𝗻𝗱 𝗺𝗮𝗸𝗲 𝗶𝘁 𝘀𝗺𝗮𝗿𝘁 𝘄𝗶𝘁𝗵 𝗶𝗻𝘁𝗲𝗹𝗹𝗶𝗴𝗲𝗻𝘁 𝘀𝗲𝗻𝘀𝗼𝗿𝘀: 𝗵𝗲𝗿𝗲 𝗶𝘀 𝗮𝗻 𝗲𝘅𝗮𝗺𝗽𝗹𝗲 𝗺𝗮𝗱𝗲 𝗶𝗻 𝗔𝗺𝘀𝘁𝗲𝗿𝗱𝗮𝗺 A 12-metre 3D-printed pedestrian #bridge designed by Joris Laarman Studio and built by Dutch robotics company MX3D has opened in Amsterdam recently. The bridge, which was fabricated from stainless steel rods by six-axis robotic arms equipped with welding gear, spans the Oudezijds Achterburgwal in Amsterdam's Red Light District. The structure used 4,500 kilograms of stainless steel, which was 3D-printed by robots in a factory over a period of six months before been craned into position over the canal. Its curving S-shaped form and balustrades with lattice-style perforations were designed using parametric modelling software. The The Alan Turing Institute and Arup fitted the structure with a network of sensors that allows the bridge to collect data and build a digital twin to keep track of its performance and health. The digital twin will monitor corrosion, load changes, environmental conditions and pedestrian use in efforts to further data-centric design. 💡 Did you know that this production technique can save material? #engineering #future #innovation #3dprinting For more: 📌 Follow #ImpressiveEngineering 📌 Click on the 🔔

Mahesh P.S.

📈 125 Million Views/Year I 📊Fractional CMO I 🧪Marketing Data Scientist I 💼 AI- Marketing Automation I 📊 21000 + Mktg. Tests I 🎯B2B Digital Strategy I 🧪GTM Strategy I🚀AI-Martech I 💡eCommerce I 🧪Edtech I 💼

10mo

This is truly an impressive feat of engineering and innovation! The combination of 3D printing, robotics, and parametric modeling has resulted in a stunning pedestrian bridge that not only serves its functional purpose but also adds to the aesthetic appeal of Amsterdam's Red Light District. The use of stainless steel rods and lattice-style perforations in the design showcases the versatility of this production technique while also reducing material waste. It's fascinating to see how technology is enabling us to create structures that are not only visually striking but also environmentally conscious. Furthermore, the integration of sensors to collect data and build a digital twin is a remarkable advancement. The ability to monitor corrosion, load changes, environmental conditions, and pedestrian use will undoubtedly contribute to future data-centric design and maintenance efforts. Thank you for sharing

Inge van Vierssen-Berghorst EFA

Erkend Financieel Adviseur/ Taaltalent/ Humanist/ Creatieveling/ Omdenker/ Gastdocent LEF Stichting Leven en Financiën/ Widow

10mo

Nice bridge, amazing technique. I soon have to go to Amsterdam to watch. Haven't been there for ages. Thanks Giu 🦉🦉 1679 to go....😉

Like
Reply
Gregory Harington

Consultant and Project Manager. NNBP - The South African Nuclear New Build Programme. Eskom RFI GEN3281

10mo

Here in South Africa Murray and Roberts took less than six months to leave out 96 bolts which contributed to the temporary works collapse which occurred on 14 October 2015 at the construction site of the Grayston Pedestrian and Cycle Bridge.

Paul Richards

MD GUR Build UK ltd nZeb "Housing" System. Platform H specialist. Passive Haus products developer.

10mo

Impressive!

Like
Reply
Ariel Olate López

Metals & Minerals LATAM | IDOM | ConstruyeBIM | ACC | RVT | P3D | BIM360 | Unreal 5 | USACH

10mo
Like
Reply
See more comments

To view or add a comment, sign in

Explore topics