Giatec was proud to be a part of the Philadelphia Schuylkill River Trail bridge project with PKF-Mark III, Inc.!
Use Case:
- PKF used our SmartRock wireless sensors to monitor concrete strength and temperature.
Impact:
- Real-time notifications sent to the PKF team's mobile app, when desired concrete temperature and strength was reached.
Ongoing results:
- Scheduling Efficiency: Accurate data on concrete strength helped in scheduling subsequent construction activities efficiently, minimizing downtime and delays.
- Cost Management: Monitoring prevented issues like delayed curing or weak spots, reducing costs associated with repairs, rework, and project overruns. Provided large savings on utility costs due to precise monitoring and notifications of concrete temperature.
- Quality Control: Sensors ensure the curing process meets specified parameters and standards; and provide precise data for documenting concrete performance.
We're proud of the progress, and look forward to supporting PKF and their concrete operations for the remainder of their project duration!
We here at PKF-Mark III, Inc. are thrilled and proud to share this progress update from CBS Philadelphia on our Philadelphia Schuylkill River Trail bridge project. Our team, along with PennDOT and the City of Philadelphia, has put a lot of hard work and dedication into this project helping to connect some of the outlying neighborhoods to Center City! This project is on track to be completed in 2025!
https://lnkd.in/erbQg6QG
#PKFProud #excellencebuiltointegrity #aboveandbeyond #schuylkillrivertrail #philadelphia #construction
Why Philadelphia's Schuylkill River Trail is about to get longer
msn.com
Senior Vice President at Halff
1moReally excited about the next level of investment and engagement our people are leading in Baton Rouge and across the entire state of Louisiana!!!