Harbor Pacific Contractors is leading the upgrade of the WWTF for the City of Granite Falls. Crews have completed excavation for a new double oxidation ditch located in the foreground, adjacent to the existing WWTF at the top of the photo. SAK Builders, Inc. is currently forming concrete for the new oxidation ditch. #pnw #drone #dronephotography #wastewatertreatment SAK Builders, Inc. Gray & Osborne
Harbor Pacific Contractors, Inc.’s Post
More Relevant Posts
-
Yes, you can include up to two gantry cranes in the analysis. Crane Beam can optimise the design of crane runway beams while accommodating various configurations of crab mechanisms – crabs can have up to four wheels, which makes for smooth and efficient movement along the beam. If you have any questions about any PROKON 5.1, please visit https://lnkd.in/dvU7-mRS now! #PROKON #StructuralEngineeringSoftware #EngineeringSoftware #CraneGantry
To view or add a comment, sign in
-
Whole machine use national standard steel JMC National VI CAB,Fit 2 passages(including driver) Humanized seat design High strength bucket can load totally 200KGS Front V + rear H outrigger, high-strength steel box-type outrigger,built-in pipeline Remote control maximum remote-control distance is 200 meter Four section polygon synchronous telescopic boom
To view or add a comment, sign in
-
Whole machine use national standard steel JMC National VI CAB,Fit 2 passages(including driver) Humanized seat design High strength bucket can load totally 200KGS Front V + rear H outrigger, high-strength steel box-type outrigger,built-in pipeline Remote control maximum remote-control distance is 200 meter Four section polygon synchronous telescopic boom
To view or add a comment, sign in
-
Whole machine use national standard steel JMC National VI CAB,Fit 2 passages(including driver) Humanized seat design High strength bucket can load totally 200KGS Front V + rear H outrigger, high-strength steel box-type outrigger,built-in pipeline Remote control maximum remote-control distance is 200 meter Four section polygon synchronous telescopic boom
To view or add a comment, sign in
-
Whole machine use national standard steel JMC National VI CAB,Fit 2 passages(including driver) Humanized seat design High strength bucket can load totally 200KGS Front V + rear H outrigger, high-strength steel box-type outrigger,built-in pipeline Remote control maximum remote-control distance is 200 meter Four section polygon synchronous telescopic boom
To view or add a comment, sign in
-
Whole machine use national standard steel JMC National VI CAB,Fit 2 passages(including driver) Humanized seat design High strength bucket can load totally 200KGS Front V + rear H outrigger, high-strength steel box-type outrigger,built-in pipeline Remote control maximum remote-control distance is 200 meter Four section polygon synchronous telescopic boom
To view or add a comment, sign in
-
Whole machine use national standard steel JMC National VI CAB,Fit 2 passages(including driver) Humanized seat design High strength bucket can load totally 200KGS Front V + rear H outrigger, high-strength steel box-type outrigger,built-in pipeline Remote control maximum remote-control distance is 200 meter Four section polygon synchronous telescopic boom
To view or add a comment, sign in
-
Int'l Trade Manager for World Leading Battery Energy Storage+ Hybrid Inverter, EV Charging and Micro-Grid Solutions
Bridge Girder Segment Launcher, or segmental launching gantry (LG), used to erect elevated viaducts of railway and highway bridge projects. In this video, a launching gantry, designed and provided by us, features top-notch technical parameters of 700tons hanging capacity steel truss beam, 45meter span coverage, slope and curve adaptability. Superstructure is allowed to be installed in segmental form (Front/ Rear/ Bottom feeding) or in whole span fashion as bridge beam launcher. Two trolleys are equipped on the supporting beam, respectively with 70tons and 10 tons hoisting capabilities.
To view or add a comment, sign in
-
Why use and choose Flexible Airborne Helipad? *Replace concrete in the fields, *Portable and easy to handle, *2 people can assemble approx. a Helipad of 300 m² within 6-7 hours, *No specialist handling required, *Quick to assemble and disassemble, *Robust with no breakable parts, *Anti-slip and easy to clean, *Little to no ground preparation, *Installation on nearly all kind of terrain and surfaces, *Versatile, fits designs, curves around obstacles
To view or add a comment, sign in
-
Surface Analysis in South of Sinai Governorate GDB Management ✔ Surface Analysis ✔ IDW ✔ Slope ✔ Aspect ✔ Spatial Analysis✔ Contour ✔ Layout ✔ #arcgis #arcgispro #surface_analysis #slope #Idw #aspects #spatialanalysis #contour #layout #esri
To view or add a comment, sign in
313 followers