Commissioning Phases & Handover Model Checklists are used by both the construction group and by the installation group. A-Sheets are Inspection Test Records (ITR) used during the Construction Completion Phase to verify the correct installation of equipment. Not to be confused with B-Sheets, which are ITRs used to verify functional and performance requirements during pre-commissioning. Get a complete definition of all the checksheets used during the stages of commissioning at the "visit website" link above. Become a member of the Industrial Commissioning Association for a complete understanding of the Commissioning Phases & Handover Model. #commissioning #freemembership

  • timeline
Akala Egbo

Commissioning | QA/QC | Technical Integrity Engineer | Project Quality Engineer | Inspection

2mo

There seems to be confusion in some projects about completion of A checksheets. Between QAQC, Construction and CSU teams, whose responsibility is it to put pen to paper in completing the A Checksheets?

Like
Reply

Thanks for sharing Paul. Some great information.

Like
Reply
Raymond Noble

LNG CSU/ORA Senior Director

2mo

API RP 1FSC was created to try and have the basic industry alignment on terminologies