🚧 Safety First, Quality Always - This is how we protect our team and your property! 👷 Ever wonder what keeps our crews safe when working deep underground? Say hello to our trusty shoring box - the unsung hero of utility excavation! This heavy-duty aluminum shield system isn't just a big metal box; it's a critical safety component that allows us to complete underground utility work efficiently while protecting our dedicated team members. At Ismael's Construction, LLC, we invest in top-tier equipment like this because we believe in doing things right the first time. This shoring system prevents soil cave-ins during deep excavations, creating a secure workspace for installing or repairing underground utilities like water lines, sewer connections, or storm drainage systems. Notice the robust cross braces and pristine condition of our equipment? That's no accident. We maintain our gear meticulously because your project's success and our team's safety are our top priorities. From residential service connections to commercial utility installations, our experienced crews handle it all with precision and care. But excavation is just one facet of what we do! Whether you need: 🚧Demolition services 🚧Concrete foundations and footers 🚧Professional concrete flatwork (sidewalks, patios, driveways) 🚧Asphalt paving and sealcoating 🚧Drainage solutions 🚧Site preparation We're your trusted local experts in Lynnwood and surrounding areas. Our commitment to safety, quality, and customer satisfaction shows in every project we tackle. Ready to start your next project with a team that takes pride in doing things the right way? Call us today at 425-770-1722 (ext. 1) to schedule your FREE estimate. Let Ismael's Construction, LLC show you why we're the preferred choice for contractors in the Puget Sound region! #Construction #SafetyFirst #Excavation #UndergroundUtilities #LynnwoodWA #LocalBusiness #QualityWork #ConcreteWork #AsphaltPaving #PugetSound #CommercialConstruction #ResidentialConstruction
Ismael's Construction, LLC’s Post
More Relevant Posts
-
The calm before the storm (well, work at least). Demolition is complete at the Eight Mile Plains site. The team at Urban Earthmoving (Qld) Pty Ltd have done a brilliant job, plus left the site in nice, neat condition. It’s time for Team PKM Earthmoving to mobilise to site and start civil works. This is a 4-lot subdivision, so there is always plenty to do on-site for the contractor. On this project, we have all the standard fare: sewer, water, stormwater, filling and level 1 compaction. And if you caught my last post – fencing and block work have been added to the scope 😅 We are also working with an arborist to manage the potential impact on the street trees on the frontage of the site. Our driveway works and stormwater pipes are running through the drip line and therefore arborist supervision is required. #development #property #civilengineering #projectmanagement #civilconstruction #townplanning #developmentmanagement
To view or add a comment, sign in
-
-
Working in colder weather? 🥶 We know we aren’t quite in the winter months yet here in Texas, however, better to prepare early. Here are some essential tips to keep your construction site safe and productive this winter: ❄️ Winterize equipment ❄️ Store materials properly ❄️ Use cold-weather concrete mixes Save these tips for your construction site! #cheers #service #evansconsultingandconstruction #fortworthconstruction #generalcontractor
To view or add a comment, sign in
-
-
shows a common issue with hillside homes: improper construction on unstable slopes. Here's what the image highlights: Incorrect Construction (X): * Stuffed Fill: The house is built on a slope with loose fill material (like dirt or gravel) packed around it. This type of fill is unstable and can settle over time, causing the foundation to shift and crack. * Cracks: The house shows visible cracks in the walls, indicating potential structural damage caused by the unstable foundation. Correct Construction (✓): * Retaining Wall: A retaining wall has been built to stabilize the slope. This helps prevent soil erosion and movement, which can damage the foundation. * Slope Limit: The fill limit is clearly defined, preventing excessive soil buildup around the house. * 100cm: This likely indicates the minimum distance between the foundation and the edge of the slope, which is crucial for stability. Key Takeaways: * Building on a hillside requires careful planning and construction to ensure stability. * Using proper techniques like retaining walls and controlled fill placement is essential to prevent foundation issues. * Ignoring slope stability can lead to significant structural damage and safety hazards.
To view or add a comment, sign in
-
-
Council Stormwater under the kerb. Another story where we just missed the threshold of the cover between the stormwater obvert and underside of the kerb. This is a gravity stormwater pipe and changing the height of it in one spot is not going to work as it will affect the designed fall for the water to flow. So we have to work with what we have. Even though it is a minor encroachment we still have to rectify the deviation from the design. Until then there is a stop work order and I have to get the surveyor and engineer involved on the day to address the depths of the pipe in detail. Hopefully can resume roadworks on Monday without concrete encasing it. I am not having luck lately with going through the roadworks smoothly... #propertydevelopmentsydney #realestateexperts #propertyinvestmentsydney #investmentpropertysydney #RealEstateAdvice #realestateinvestmentsydney #propertyinvestorssydney #realestateinvestingsydney #propertydevelopersteam
To view or add a comment, sign in
-
-
Welcome back, here are the some key updates for July at Dacy Business Park: 1. *Building Delivery Delay* Unfortunately, the first building delivery has been pushed back a week to August 8th. The storm water pipes are taking a little longer to install and get the correct elevation. It's better to be right than fast. 1.5. *Select Fill Deliveries and Upper Pad Work* Ranger continues to deliver select fill, and our team is actively working on the upper pads which will comprise Phases 2, 3 and 4. Ranger Excavation is doing an excellent job of keeping this project on schedule. 2. *Plumbing Installation* Plumbers are starting today to run pipes for the first building. We trench our own lines for plumbing and never share runs in the beam or laying pipe on top of the pad. All shortcuts that bite you in the end. 3. *Concrete Pad Preparation* Morelio Foundations, our concrete expert, will be ready to pour the first pad by the end of next week. The beams are already installed on Building 1 and is working on Building #2. 4. *Storm Pipe Installation* We've finished installing storm pipes in front of the first three buildings, ensuring proper drainage and infrastructure. 5. *Second Entrance Culvert Installation* Today, the team began installing our second entrance culvert, enhancing access to the site. 2 entrances are better than 1. 6. *Pond Outfall Wall Construction* Work on the pond outfall wall continues, with cement being poured into the stair-stepped feature today. Edgar are awesome superintendent is coordinating with our neighbor to add gravel and grade his yard for better water drainage—a thoughtful gesture to maintain good relations with our neighbors. 7. *Concrete Form Templates Ready* Lopez Construction has completed all plywood templates and is ready for the concrete forms. We faced a minor hiccup with an order, needing more nuts than anticipated. Thanks to American Bolt, we quickly ordered the additional nuts needed. A project like this doesn't just happen by clicking keys or making phone calls—it happens when sweat and blood mix with dirt and grit. We want to extend a huge thank you to all of our crews, subcontractors and foreman that are making this possible. Texas heat is brutal and we appreciate everything you do. This project would not be possible without you!
To view or add a comment, sign in
-
Contiguous & Secant Retaining Walls! When building on sites with unstable ground or deep excavations, you’ll often hear about contiguous and secant retaining walls. But what are they? 🟢 Contiguous Piled Walls – Gaps between piles, ideal for temporary or less water-sensitive applications. 🔵 Secant Piled Walls – Overlapping piles, better for water control and permanent structures. Why Use Them? ✅ Site stability – Prevents soil collapse in deep digs ✅ Space saving – No need for bulk excavation or traditional shoring ✅ Flexibility – Works in tight urban sites ✅ Water control – Secant walls help with groundwater management At Alpha Piling, we deliver expertly installed retaining walls nationwide, ensuring safe, cost-effective, and efficient solutions for housebuilders and contractors. Got a project in mind? Let’s talk. #RetainingWalls #Piling #Construction #Civils #Groundworks #HouseBuilding #AlphaPiling
To view or add a comment, sign in
-
-
Before we start any extension projects, we have to strip the site 👇 Site stripping involves: ✔️ Removing obstacles (such as patio slabs, unnecessary soil, masonry, plants, or fencing). ✔️ Dealing with waste (such as removing and disposing of undergrowth or trees). ✔️ Arranging skip permits (so we can dispose of waste and soil from the excavation). We also often locate and mark utilities, such as electricity, gas, water and sewer pipes, and cut them off before the excavation stage of the project. Here’s a video of the lads hard at work stripping this project’s site 👉 #Construction #BuildingProject #HomeExtension #NewBuild
To view or add a comment, sign in
-
Perry's Construction Stormwater Tip #75: If you “do it right the first time”, you shouldn’t have to repair a site. Here is one example from the 2010 Clear Water Alabama event where the project is now over 14 years old. Riprap outlet protection was installed at the pipe outlet to dissipate the energy of the flowing water. The eroded channel was shaped to design dimensions, covered in TRM, infilled with topsoil, and sodded. Other than a little vegetation management needed at the riprap outlet, the site is still pristine.
To view or add a comment, sign in
-
-
🌱 𝐖𝐇𝐀𝐓 𝐀𝐑𝐄 𝐆𝐑𝐎𝐔𝐍𝐃𝐖𝐎𝐑𝐊𝐒 🌱 At RMG Groundworks, we often get asked, "What exactly are groundworks?" Here's a quick overview to shed some light on this essential part of construction and landscaping! Groundworks are the foundation of any construction project, quite literally! They encompass a range of activities aimed at preparing the land for building. Here's what they typically include: SITE CLEARANCE - Removing any existing structures, vegetation, and debris to prepare the site for construction. EXCAVATION - Digging the earth to create space for foundations, basements, and other substructures. FOUNDATIONS - Laying the base on which buildings and structures will stand, ensuring stability and durability. DRAINAGE SYSTEM - Installing pipes and systems to manage water flow and prevent flooding. UTILITIES INSTALLATION - Setting up essential services like water, gas, electricity, and sewage systems. LANDSCAPING - Shaping the land to fit the design plans, which can include leveling, creating slopes, and adding features like retaining walls. Groundworks are crucial because they ensure that everything built on top has a solid and secure base. Without proper groundworks, the integrity and longevity of any structure could be compromised. At RMG Groundworks, we pride ourselves on delivering meticulous and reliable groundwork services to ensure your projects are built on the best possible foundation. Have more questions? Drop them in the comments or get in touch with us directly through DM's! #Groundworks #Construction #Foundation #Excavation #Landscaping #RMGGroundworks #BuildingBetter #southwales #welshbusiness
To view or add a comment, sign in
-
-
Limecrete is not suitable for all sites and circumstances, especially water laden sites as there may be just too much moisture for the limecrete to handle. Ensuring the ground below the limecrete slabs was dry enough and not liable to saturation during periods of wet weather, with a high-water table was critical. Site investigation was conducted during the early stages of construction to ensure limecrete was still a viable system. Ensuring the existing house foundations were not undermined with the limecrete slab excavations. Existing heritage buildings sometimes have low foundations. To ensure limecrete was viable the contractor was asked to excavate small trial holes at each corner of the space to check there was enough wall depth to accommodate the full limecrete slab build up before excavating fully was also critical. Ensuring the external ground levels were not higher than the internal floor level and that external rainwater could drain away from the house was important. Saturated walls and water that is allowed to pond near walls can reduce the capability of a limecrete floor slabs ability to buffer water below the limecrete, in the foamed glass aggregate insulative layer.