Kristoffer Hocking’s Post

View profile for Kristoffer Hocking, graphic

Contract Manager @ CPB Contractors

This is promising. Through modular design, European businesses achieve onsite construction time for similar building typologies at 0.4 weeks per bed. Change has to flow from top down, it won’t happen pushing up. #modular #modularconstruction #prefab #dfma

View organization page for Cox Architecture, graphic

74,047 followers

Revolutionising the student and co-living typology - the rise of purpose-built accommodations demands innovative design and construction solutions. Embracing modular construction for Herring Road and Frederick Street, COX are addressing the challenges of high-quality, affordable housing. Showcasing efficient, community-focused designs, these projects offer users spaces to connect and disconnect, be active or restful, offering a home-like feel. ‘Designing great places is at the heart of what we do, but we also need to build them better. Better means more affordably, more sustainably, and with assured quality. Modular construction is an exciting opportunity to achieve these goals’ COX Director, Felipe Miranda Read more: https://lnkd.in/gNF6-Wr3 Client: FREECITY GROUP

To view or add a comment, sign in

Explore topics