Manzoor Hussain Niazi’s Post

View profile for Manzoor Hussain Niazi

Project Manager | Construction | Deconstruction | Budgeting and cost control | Scheduling and Planning | Resources Management | Heavy Machinery Operation | Client Management | Structural Analysis

During the preparation phase for the controlled blasting demolition of a 25-meter-tall overhead water tank, strict compliance with industrial safety standards and protocols is of utmost importance. A critical aspect of the preparation involves the installation of three protective layers comprising galvanized iron (GI) mesh and geotextile fabric around the structure. These layers are strategically designed to contain and mitigate the ejection of debris, ensuring the protection of nearby equipment, structures, and personnel. This approach is widely recognized as a highly effective and safe method for controlled blasting, significantly reducing the risk of fly rock. Additionally, scaffolding is carefully erected to provide structural stability and facilitate the precise placement of the protective layers. #linkdinpost #feedlinkdin #linkdin #linkdinapply #linkdinworld #controlblastig

To view or add a comment, sign in

Explore topics