Do you know the correct transmission line maintenance/refurbishment activity shown on this photograph?

  • No alternative text description for this image

Could be de-spacering re-spacering using the battery spacing chairs. They should be staggered though so not working above one another incase something is dropped!!!

Jorge M. Roque

• Overhead Linemen/Manteinance Aereal High Voltage Lines • Drone Pilot STS (Eu) Profesional Licence • Electromechanic.

1mo

as a technician in risk prevention and preventive resource and Lineman, what appears in the photo, in the first instance is negligence!!!What need is there to work on top of each other? You should NEVER work in SUPERPOSITION!!! What these operators do is put or remove "spacers"

Like
Reply
Mark Wright

Transmission Lineman

1mo

Spacering as it looks like shiny new conductor

Like
Reply
Paul De festa

General Foreman at Keltbray T&D

1mo

😂

Like
Reply
Richard Nailor

Retired Independent Engineering Audit and Assurance Professional

2mo

Replacement of line spacers using boswains chair.