Mohamed Adel’s Post

View profile for Mohamed Adel

Senior Structural Engineer at Amr Abdel Rahman Consultant (AACE)

Shoring system for new annex building of "Shepheard Hotel" at Corniche El Nile. The new annex building is including 3 basements floors, ground floor and 14 typical floor while the foundation level is (-12.00) m. So, a shoring system is required to retain the soil during the excavtion process. The shoring system is consists of precast diaphragm wall of 0.64 m thickness and 25.00 m depth beside horizontal bracing struts at 3 different levels to support the diaphragm wall horizontally against the soil pressure.

  • No alternative text description for this image

To view or add a comment, sign in

Explore topics