Whenever a crane lift or move a load it will need lifting plan. . The man who make a plan for lifting he is called Originator(RIGGER) ■Types of Rigger: ▪︎Rigger I ▪︎Rigger II ▪︎Rigger III ■Who will make lifting plan? Rigger I or Rigger II ■Who will approve lifting plan? Only Rigger 1 will approve lifting plan ■Rigger required for covering different lifting activities? ▪︎If load is 1 to 10Ton Rigger III should be present ▪︎If load is 11 to 39.9Ton Rigger II should be present ▪︎If load is 40ton or above Rigger I must be present for lifting activity. ■For all type of Critical lifting Rigger I must be present to cover the Activity. ##safetyfirst #HSE #Riggersafety