Nothing can stop Northeast Remsco Construction (NRC), not even boulders! Yonkers Contracting Company, Inc. hired NRC to install eight 80-foot long, 36-inch diameter pipes via microtunnel under the Light Rail in Jersey City. This project in collaboration with the Port Authority, presented unexpected challenges: horizontal probing revealed various obstructions along the casing alignment, including concrete, boulders, and cast-iron pipe. But at NRC, we don't back down. We quickly adapted by acquiring the advanced Geonex - Horizontal drilling solution (Horizontal Hammer Boring) DTH Drill Rig. This cutting-edge equipment features unique horizontal hammer technology, allowing us to penetrate even the most challenging soil conditions. The job was completed ahead of our estimated schedule. Now that's what we call a breakthrough! www.northeastremsco.com #reputation #workethic #teamaccomplishment #trenchless #specialist
Great work NRC! NRC is drilling the micro tunnels from the MRCE designed launching pit shown in the pictures. Thanks to Yonkers , happy to be part of the challenging project!
Impressive. Were there any unexpected crossing utilities and such?
What tipe of machines is?
The God of Bore Over 30 years of Trenchless experience
1moGreat product, I’ve been running them for several years. GeoNex builds quality machines for the toughest of conditions.