We love it when a plan comes together!
The members at 42BR were moving from a fairly traditional environment, individual and shared rooms in the period building they’d occupied for a number of years. As they had all embraced the concept of more flexible working during lockdown, our job of making a more hybrid workplace was much easier. The Chambers Director carried out some preliminary surveys of who would use the office and how they wanted to work.
The concept was to introduce an array of dedicated and shared spaces, use of collaborative areas, a flexible conference suite and individual acoustic pods for private working and online hearings. (For barristers it’s all about what their membership of chambers covers and what facilities would be available).
We validated the information collected with additional workplace surveys working with Christopher Allen of Montroc Consulting (change management specialists). It was crucial to be confident space allocation of the building selection and final scheme as we were accommodating 120 staff including clerks, finance & admin teams and barristers in a fairly tight space of just under 700sqm .
Here's what Vincent Denham, Chambers Director, 42BR had to say;
“I have now worked with Tracey and her team at Wylde IA on four refurbishment or larger fit-out projects and each one has presented a different challenge (or opportunity!) that she has taken with both hands. Just a delight to work with from a design perspective (and I am someone not afraid to challenge a professional designer) and a force of nature when necessary to get things done in the larger project team. I have no hesitation in recommending her and the team and in saying that Wylde IA would be my first choice for workplace design project.”
Check out the case study here;
https://lnkd.in/evcAJmin
#wylde #interiorarchitecture #interiordesign #interior #architecture #design #casestudy #42br #projectportfolio
Managing Director at Blackstone Strip Out Limited
3moCongratulations to the Opera team for delivering a stunning building and for receiving such a well deserved award. I was fortunate enough to have carried out the initial strip out of the building and amazed to see the finished product. Well done to all the team.