3,5 Billion EUR for Connectivity, between Europe and Asia: the Yavuz-Sultan-Selim-Bridge.
1.4 km seem to be large, but for space dimensions it is short. It has been built just in 3 years, 2013-2016. Also short in universal time scale.
Why do I think about it, shipping below the bridge towards the Black Sea?
Turkey decided for a bridge for 3.5 B.EUR, and Europe/Germany complains about 12 BEUR for a satellite constellation connecting Europe with the hole world???
Achieving "non-dependence", also within 3-5 years!!!
Ok, the involvement of a large number of European space ecosystem players is not yet secured. This must be adjusted, including a reliable sustainable approach. But Germany alone has an annual household 2024 of 476 Billion. Hey, it is a matter of priorities, of the political parties and its individuals.
By the way: since I saw the photo of the Bosporus from space, taken from the German EO-Sat ENMAP (see cover page of "Deutsche Raumfahrtstrategie"), for which we HPS delivered an optical baffle as secondary structure, and since I was first time in Romania at the Black Sea in Mamaia and Vama Veche, I always wanted to experience the water-route by myself. COOL, I DID IT TODAY! "Teşekkürler, Türkiye" for this matching relation.