Ten years of Primus Line 'Down Under' Ten years after entering the Australian market and eight years after founding a branch there, we look back on a history of success: ☑️ More than 70 projects realised in total ☑️ Longest rehabilitation stretch: around 3,000 metres in Brisbane ☑️ Longest single-shot installation: 1,400 metres in on pull at Mount Cole ☑️ Preferred applications: Rehabilitation of pipes in sensitive environments such as cultural heritage sites, city centres, under railway tracks, roads or rivers We are happy to have made it onto the cover of Trenchless Australasia. Read the whole story and learn which challenges had to be overcome. 👇
The December edition of Trenchless Australasia is now online and available to be read as a digital magazine. This issue celebrates Rädlinger Primus Line whose local subsidiary, Raedlinger Primus Line Pty Ltd, is celebrating 10 years operating in Australia and New Zealand. During this time the company has been influential in educating utilities and asset owners about the benefits of trenchless rehabilitation, completing more than 70 projects, including a 3,000 m Urban Utilities installation under Ann St in Brisbane. The edition also contains a training and education section, featuring ACP AUSTRALIAN CUSTOM PIPES PTY LTD, IBAK Australia Pty Ltd and Channeline. Other contributions come from Minitap, SECA - Sewer Equipment Company (Aust), Michels Trenchless Pty. Ltd., Vermeer Australia, Vector Magnetics, TRACTO Australia, Ditch Witch CEA, OptionX Group, Rob Carr Pty Ltd, kwik-ZIP Spacers and Centralisers, Pipe Core Pty Ltd, Interflow and Nuflow Australasia. Read the December edition now: https://lnkd.in/gAdCKZGX #trenchless #trenchlesstechnology
Congratulations on the milestone!
Business Development Manager @ Rädlinger primus line GmbH
3moCongrats! And best of luck with the next 10 years