Raised Floor Solutions Ltd’s Post

RFS are currently undertaking the upper floor composite slabs at Osborne Yard, Manchester which consists of supply and installation of over 8500m² of Multideck 50 and 12,000 shear studs. Shortly, we will be commencing the upper floor in-situ concrete works, including Bekaert Dramix Steel Fibre reinforcement. Dramix Steel Fibres provides our clients with numerous benefits over traditional reinforcement methods such as improving concrete durability and strength, reducing carbon footprint and a shorter programme of works.

  • No alternative text description for this image
  • No alternative text description for this image
  • No alternative text description for this image
David Clark

Sales Manager at Bekaert

4mo

Great to work with both Raised Floor Solutions and Kingspan on this and many other jobs. #Dramix

Iain Cadzow

Concrete estimating manager BHC

4mo

It is great to see steel fibres being used on upper decks We will be starting Holborn viaduct in about 4 weeks with Bekaert steel fibres also A 13 storie office block over 30,000m2 The carbon saving is also significant and well worth exploring

See more comments

To view or add a comment, sign in

Explore topics