Our London team are making significant strides on the redevelopment at 55-58 Pall Mall and 1-4 Crown Passage. The structural phase is near completion, with the steel frame now reaching the top floor, and Cross-Laminated Timber (CLT) floor panels fully installed to all levels. Our team have fully completed the pre-cast concrete staircase to level seven, and work is now underway on joist and ply installation for the external terraces and the Pall Mall mansard. Scaffolding continues on Crown Passage, the Pall Mall elevation, and the east elevation alongside 54 Pall Mall, setting the stage for exterior envelope works early next year. Composite concrete floors for levels four to roof level will continue, with internal fit-out work beginning early next year. Client – PKS Immobilien Development Manager - Simten Project Manager – Gardiner & Theobald LLP Quantity Surveyor – exigere Architect – Orms Structural Engineer – Heyne Tillett Steel Services Consultant – FLATT #London #Construction #Development #Offices
-
-
-
-
-
+1
Well done to you all! Looks incredible!
Was fantastic to see the project yesterday and the progress made so far 😊
Great progress on this iconic project!
I had a great walk around the scheme last month and was really impressed with how the team are building in a super tight site with significant temporary works to work around. Hopefully the finished building will look as good as the renders!
Nice…not even 12 months ! Great job !
Pleased to be delivering this scheme
Class one adr and vastly experienced hiab operator
4moIconic job great pics of falcon tower crane 🏗️ 👍