T3P1:- Construction of three Tunnel by NATM With ballast less track in panvel - karjat section Benching properly safe blasting
sandeep kumar sharma’s Post
More Relevant Posts
-
Lowering of structural girder on plate bearing at panvel karjat suburban railway mtup-3 in progress
To view or add a comment, sign in
-
slope protection item in WPS - Wang peruntukan sementara. - now 2 layers steel sheet piles settle down there, into 12.5m & 8.5m L. strength of 235N/mm² to cater bending moment and shear force.
To view or add a comment, sign in
-
-
ILmonte galala project Zone C4 Type V4 (flip slab) with stair and hidden beams
To view or add a comment, sign in
-
-
Concrete work of bottom dome & Conical Section of Intze Oht ZBT #OHT #WATERSUPPLY #MULTIVILLAGESCHEME #MCK #MUGRODYCONSTRUCTIONS #DRINKINGWATER #TANK #KARNATAKA
To view or add a comment, sign in
-
#Quays A quay is an artificial wall or bank, usually of stone, made toward the sea or at the side of a HARBOUR or river for convenience in loading and unloading vessels. It is a structure of solid construction along a shore or bank that provides berthing and generally provides cargo handling facilities. A quay usually refers to an artificial embankment lying along or projecting from a shore and mainly used for loading and unloading. A similar facility of open construction is called a #wharf.
To view or add a comment, sign in
-
-
Abutment wall and shear key concreting Muanad bridge WP29
To view or add a comment, sign in
-
🔨Lucara achieved significant progress in the development of the Karowe Underground Project during Q3 2024: ➡️ Shaft sinking and shaft connection lateral development continued to advance in Q3. ➡️ The ventilation shaft is ahead of July 2023 rebase schedule. ➡️ By the end of Q3, the production shaft reached a depth of 686 metres below surface and the ventilation shaft reached 582 metres below surface. 🔗 Learn more about our progress in our latest Q3 2024 release: https://bit.ly/40L29Ws
To view or add a comment, sign in
-
-
Preparation and installation of Pile sheets to prevent shrinkage on Dajal Canal.
To view or add a comment, sign in
-
-
Structure excavation with precision! Today’s task: GPS-guided footing excavation at Azura of Mukwonago.
To view or add a comment, sign in