Technip Energies’ Post

View organization page for Technip Energies, graphic

578,839 followers

Neste Rotterdam project lift campaign completed! 🏗️ ⏳   We are pleased to report that in March our team at the Neste renewables refinery in Rotterdam completed on schedule a heavy lift campaign involving the installation of eight major columns.    The most challenging lift of the campaign was the hydrotreating reactor, which weighs 700 tons and is 50 meters long. Preparation involved excavating 3,500m3 of soil – the affected area was equivalent in size to 28 soccer pitches!   The Rotterdam Capacity Growth project will increase overall renewable production capacity at the plant by 1.3 million tons per year. We have been working with the client for many years and are glad to continue the collaboration. 🤝    #BePartOfTheSolution #Biofuels #Engineering

  • No alternative text description for this image
sureshan cv

Sr. Project Engineer piling at spie batignolles

2mo

Good Morning Sir Sir l have 24 years experience in the piling foundation field. I have good knowledge of all site activities Bore Pile, Contiguous pile,CFA, Secant pile, Dam drilling and Grouting works pile and Excavations work, Diaphragm Wall, Micro Pile, H/I-Beam work, Anchor works, Capoing Beams and Gauied Wall for Diaphragm wall and HSE, Site safety and environment. All pile Testing (Statics, Dynamic, integrity, Sonic, cavity, camara. And Bentonite test, Concrete, test) Steel fabrication  (Piling and Diaphragm wall) works, Equipment maintenance, and site arrangement site requirement. Flow to Clint, consultant, contractors. Make Daily Site Sedulous and Reports and  Submission Seniors. Sir l heard about that in your websites there is required skill project Engineers and other vacancy. Sir l will join with you soon. Sir l wii promising you i will build your organization by the best levels. Sir i will handle whole project activities safety, HSE, Production, Clint , Consultant, Equipment, Site requirement's , Dailey site schedule, daily reports completed projects contract period and no any complaint of project, reduced the Site cost. Thankas Eng. Sureshan 00919995741303 00971506229594 sureshan.cv@gmail.com

Like
Reply
Rolando Camardese

Owner & Manager bij Tisac B.V.

2mo

Tisac B.V is a company that installed all the trays, internals, packing in 30 column (diameter from 800mm up to 10000mm at the Borealis New PDH Plant Project Kallo (Belgium).

José Manuel L.

Haciendo fácil lo difícil. O al menos intentándolo... ¿Por qué no?

2mo

Great job. Congrats If you are looking for a reliable collaborator (subcontracting), please contact me through my email address

Like
Reply

Good morning . I am looking for a job. I can work in the Netherlands, because I have a basic, valid VCA, obtained in 2018.

Like
Reply
PRANTIK KUMAR RAY

Senior General Manager at thyssenkrupp

2mo

May Be Soon Tree Planting Begins To Make It Naturally Green Sorrounding.

Ruel Reyes

Mechanical Technician at SPIE Oil & Gas Services

2mo

interested to join in this project

Like
Reply
Vito Marco Lo Presti

Special. Technical Assurance (Maintenance) presso ENI S.p.A.

2mo

What is the average height and diameter of the columns ?

Like
Reply
See more comments

To view or add a comment, sign in

Explore topics