When is the world going to arrive at the realization of the truth? A real scheduler is not simply an artist who paints horizontal lines on a page. True scheduling is a science wherein E.V.M. Earned Value Management, Actual Project Duration, and Actual Costs, as only a world expert can perform. When dealing with this author and asking for a timely cost and duration of your project Abstract Owners and schedulers have eased into the fallacy of non-realistic scheduling for so long that long-term errors have become accepted as “Standard Practice.”   It’s a quandary; Engineers analyze material stress, clearances, and chemical reactions with the available data they are required to access. A competent P.C.E., such as us from the Guild of Project Controls, has codes of ethics not to share the customer’s information with anyone. But require complete cost information to perform our science.   Did Primavera P6 and Microsoft Project Professional simply take a stab of designing great functionality into their scheduling software systems, or was this through te request and response to professional needs?     To explore this in-depth, I’ll begin with the following questions:       i. How do you execute a valid 50-million-dollar bid?     ii. How do you manage a valid 500-million-dollar bid?   iii. How do you achieve a valid 30-billion-dollar bid?   iv. How do you manage a valid 1-trillion-dollar bid?   Who Should be interested? 1. Construction company owners. 2. Prime Shareholders & Investors 3. The U.S.A. taxpayers. 4. States. 5. Cities. 6. Counties.     How is this degree of accuracy accomplished? 1st.   You must utilize a Professional. 1st.1      A professional who knows the work of every person on a construction job site to a degree where he could instruct them how to perform their work. 2nd.1 A professional knows the complete functionality of the scheduling software and why it was designed in that manner to generate reports as needed/wanted by shareholders. Too many attend classes for P6 and other software systems and only pain these horizontal lines. 3rd.1  A Time/Motion Specialist. 4th.1   A Risk Analysis Specialist. 5th.1   A person with 20+ years of industrial experience 6th.1   A person with 12+ years of commercial Construction. 7th.1   A person who can perform Cash flow reports. 8th.1   Perform weather research for accurate project cost and timeline.

To view or add a comment, sign in

Explore topics