Inspection Openings – Quick Guide ------------------------------------------- UG-46 should be read in its entirety – a few brief points: UG-46(a) – Vessels with compressed air or with corrosion, or with erosion, or with mechanical abrasion need inspection openings. Exemptions: Air dried to atmospheric dew point -50°F or lower, Shell side of fixed tube heat exchangers Non-corrosive service Interpretations Some interpretations from https://lnkd.in/dHd7AJnz. Refer to the actual interpretations for the full text. Caution- old interpretations remain even after they have been superseded by code changes that render them obsolete. VIII-81-56 and VIII-77-11 – it is the users job to determine if a service is corrosive (caution: VIII-1-04-15 and VIII-1-07-63 define under what conditions air is considered non-corrosive) VIII-1-04-15, VIII-1-07-63 and VIII-1-89-93 – exemption per UG-46(a) for air, dried to -50°F and not VIII-1-86-31 – inspection openings are not required for non-corrosive service VIII-1-83-264 – if openings are to be used for inspection, the plugs must be supplied by the manufacturer VIII-1-83-336 – any size vessel can be non-corrosive and flexibility in sizing of openings VIII-1-83-358 – what qualifies as an inspection opening (this interpretation is probably superseded by code changes made in 1987) VIII-77-101 – inspection openings for heat exchangers and telltale holes (very old, probably superseded by code changes to UG-46 directly related to heat exchangers and use of telltale holes) VIII-80-93 – configuration of threaded openings rec 14-2223 – inspection nozzle size limits for cold-stretched vessels rec 15-748 – understanding UG-46 opening size requirements VIII-1-01-122  – corrosive service requires inspection openings even if the corrosion allowance is zero VIII-1-92-136, VIII-79-12 and VIII-1-95-115 – substitution of inspection nozzle sizes, and non-corrosive service VIII-1-95-46 – if a corrosion allowance is specified, then the service is corrosive unless otherwise stated on the MDR PTB-4 “ASME Section VIII – Division 1 Example Problem Manual” PTB-4-2013 provides example E4.5.5 which briefly discusses exemptions to UG-45 rules for inspection only openings.

  • No alternative text description for this image
  • No alternative text description for this image

To view or add a comment, sign in

Explore topics