Before and after of a recent slab jacking project. Image 1 shows the team measuring the slab height difference before the slab jacking. Image 2 shows the completed slab jacking project, with 30mm lift being achieved and the tripping hazard being eliminated. Concrete repair and joint sealant are required for continued protection.