New features for wind project logistics planning and reporting on wind farm simulations for the construction phase
🎯 Enhanced precision of wind project logistics planning with Date and Time Restrictions
You now have the power to define specific timeframes during which particular logistics become unavailable for use on a project to forecast costs and availability accurately.
New functionality for more realistic case-building of wind logistics
This enhancement empowers you to accurately model and manage real-world constraints within your projects, providing a more comprehensive and realistic modelling experience. These constraints could encompass Local Laws, Environmental regulations, Cost optimization, and adherence to authoritative rules and regulations.
Date: Wednesday, October 18th
Time:10.00 CET (GMT+1)
🚀 NEW FEATURE: Enhanced wind farm reporting with new Project Plan feature
Managing your wind farm project simulations has never been simpler! The Project Plan Report offers a holistic view of your entire project timeline within a single report. The Project Plan can be downloaded in three formats: csv, MS Project and Primavera and is plug-and-play, requiring little if any set-up, and ready for users to more accurately visualise their projects.
Recommended by LinkedIn
⚠️ SNEAK PEAK ALERT! Port capacity modelling is coming soon!
💡 IDEAL FOR FLOATING WIND
Be the first to get introduced to our soon-to-be-released feature for Port Capacity that enhances modelling capabilities for advanced port logistics, component transportation and assembly processes designed for floating wind projects.
Did you miss these LinkedIn updates?
🏭 INDUSTRY ARTICLE BLOG: Helping whales migrate and babies sleep
In the practical world, vessels and cranes can't operate 24/7. Factors like rental availability, economic viability, local regulations, personnel hours, and environmental conditions such as whale migration periods pose operational challenges. Understanding these constraints is key to effective project planning.
This article explores real-world scenarios about onshore crane limitations due to local regulations and the impact on assembly completion dates. We also look into the impact on offshore jack-up vessel operations, strategically limited to avoid whale migration during specific months, affecting PBA and TBA.