Takt Time Modular

Takt Time Modular

Byggnation

Piteå, Norrbotten 465 följare

Consultancy for industrialized construction.

Om oss

We supply services within seven different segments: 1. Modular design. Start making modules or improve your present design. 2. Digital design process. From Strategic work and flow to CAD and machine support 3. Factory layout and budget. 4. Machine and software purchase for new lines including design review & FAT 5. Support with installation on site 6. Ramp up of new production lines 7. Production optimization

Webbplats
Www.takttimemodular.com
Bransch
Byggnation
Företagsstorlek
2–10 anställda
Huvudkontor
Piteå, Norrbotten
Typ
Privatägt företag
Grundat
2021

Adresser

Anställda på Takt Time Modular

Uppdateringar

  • Visa organisationssidan för Takt Time Modular, grafik

    465 följare

    We are happy to support Volumetric Building Companies with increasing TES in their factories 😊 . Takt Time Modular has supported with layouts, specifications, design reviews, FAT, shipping and SAT. We have also secured machinefiles to the new multi-function bridges.

    Visa organisationssidan för Volumetric Building Companies, grafik

    11 577 följare

    WARNING: Reading this post may trigger those suffering from Tool Envy Syndrome (TES), a serious but manageable condition affecting 84% of VBC staff. There are no known controlled drugs that treat TES, but visiting a VBC factory has been reported to alleviate major symptoms in some severe cases. Meet, Penelope. She's a hybrid multi-function bridge and the newest powerhouse in our state-of-the-art fleet of modular machines. Powered entirely from solar panels and fully automated, this lightning-fast lady can hammer down an entire floor cassette in 45 minutes flat. We'd like to see your pneumatic nail gun even come close. 😈 If you or someone you love suffers from TES it's important to seek medical attention. The crisis line at 1-800-674-9340 is staffed 24/7

    • Ingen alternativ bildtext i den här bilden
    • Ingen alternativ bildtext i den här bilden
    • Ingen alternativ bildtext i den här bilden
    • Ingen alternativ bildtext i den här bilden
  • Visa organisationssidan för Takt Time Modular, grafik

    465 följare

    Remember good times at Lindbäcks Bygg. 😀 Two years ago Lindbäcks got nominated to the Swedish lean award as the first construction company. Why? We had secured the function, availability and capacity of the machines and equipment to the new factory. We were running the most automated line ( Wall line 1 ) at 96% availability at a 7-minute takt time. (Not one machine, the whole line) We reached and surpassed the investment targets. It took us three years of hard and dedicated work. We produced more than 80 external walls in one shift. How? 1.      We all worked towards the same target. 2.      We takted the line to visualise the target in real time. We worked with the right issues by logging stop time at every takt, every day and had multiple follow ups of the issues causing the stops and we addressed the issues to other functions when needed. 3.      We secured all input: machine files, shop drawing and tolerances of all materials. 4.      We trained and certified staff to run and maintain the machines and tools on the line. 5.      We secured the machine settings and optimized the machines together with the suppliers. 6.      We could in the end experiment and test different balances to also optimize productivity. All this work created probably the best modular factory in Europe, by investing in people and work methods. The machines were only a basis. https://lnkd.in/dRMTqmdK

    Visa organisationssidan för Lindbäcks, grafik

    7 027 följare

    Vi kan stolta och glada berätta att teamet för vägglinjen i vår fabrik på Haraholmen i Piteå är nominerade till Svenska Leanpriset! Det är Lean Forum som nominerat oss tillsammans med tre andra starka kandidater; Sahlgrenska Neurokirurgi, Powertrain Engineering Sweden AB - Vevaxlar och Hillrom. #lindbäcks #svenskaleanpriset #industrielltbyggande #trähus

    • Ingen alternativ bildtext i den här bilden
  • Visa organisationssidan för Takt Time Modular, grafik

    465 följare

    Our client Evergreen modular has in a short time been able to deliver great projects. One key to success is their start in small scale. By having time to iterate and improve the product design they have reached a good design for manufacturing. Soon to a level when it makes sense to scale up the production and automate work to further decrease cost.   Some startup companies in the modular business want to create a big factory before they even have a good product design or a pipeline, and they want to create a factory where they can do everything because they don’t know what they want to do. This is a big risk for the product quality and for productivity and the whole investment case. Better to do as Evergreen - Just start and learn until you reach a good product and a design for manufacturing.

    Visa organisationssidan för Evergreen Modular, grafik

    521 följare

    PROJECT SPOTLIGHT: Richardson Road, Mt Albert, Tamaki Makaurau, Auckland, NZ START DATE: Jan 2023 CLIENT: Habitat Living                    Our modular apartments are going up at pace in Richardson Road, Mt Albert. The 3500m site will see 108 apartments with 216 volumetric modules. They are being constructed for our clients Habitat Living, developing healthier human spaces with warm, dry and carbon neutral homes for residents. #evergreen #modular #manufacturing #construction #carbonneutral #environmentalbuilding #timberframe #sustainable #apartments 

Liknande sidor