We're thrilled to be supporting the grid and the wider network through our involvement in this ground breaking MW Dispatch Transmission Constraint Management service. It’s an exciting step towards a more efficient, smarter energy future! ⚡
We hit an incredible milestone last week with our first successful trial dispatch of a generator for a transmission constraint as part of the MW Dispatch operational trials ⚡ AMP Clean Energy, became the first DER customer to participate in this market based Transmission Constraint Management service in the South East part of England. A test of the Whole System approach was conducted in which the National Energy System Operator (NESO) control room issued an instruction through the UK Power Networks' MW Dispatch solution to AMP's Distributed Energy Resource (DER). This instruction is intended to directly alleviate transmission constraints that could occur before faults. 🚀 The MW Dispatch service, a collaborative initiative between UK Power Networks and NESO, has already unlocked capacity for over 1.5GWs and connected 38MWs of generation and battery assets 🌟 This is a monumental achievement which proves our End-to-End capability with enhanced T-D data sharing at Day-ahead & Intra-day timescales; and web API-based dispatch. We're on the brink of making the service live in the coming few weeks, and the team is super excited. Stay tuned! 💥 Sima Davarzani, MSc, PhD, MIET, CEng Rachael Raine Steve Backhouse Caspar R. Keith Parker AMP Clean Energy National Energy System Operator Tim Manandhar #MWDispatch #WholeSystems